Daikin Packaged Rooftop System DPS028AHME2PW-4

Need answers fast?
Explore the manual using AI.

Daikin Packaged Rooftop System DPS028AHME2PW-4
Daikin Packaged Rooftop System DPS028AHME2PW-4

The Daikin Packaged Rooftop System DPS028AHME2PW-4 is a high-efficiency HVAC solution designed for commercial applications. This robust system offers reliable heating and cooling performance, ensuring optimal indoor climate control while minimizing energy consumption. Ideal for various building types, it combines advanced technology with ease of maintenance.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Packaged Rooftop System DPS028AHME2PW-4

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Packaged Rooftop System DPS028AHME2PW-4

Daikin Packaged Rooftop System DPS028AHME2PW-4

Create an account to install this asset package.

Maintenance Plans for Daikin Packaged Rooftop System Model DPS028AHME2PW-4

Integrate maintenance plans directly into your work orders in MaintainX.

Optional Electric Heater Service

Check mark

CAUTION: Severe loss of charge may occur if the high refrigerant pressure switch is replaced before reclaiming the refrigerant. Replace pressure switch after reclaiming refrigerant

Check mark

Refrigerant Sensors or Switches serviced

Check mark

DANGER: Hazardous voltage. May cause severe injury or death. Disconnect electric power before servicing equipment. More than one disconnect may be required to de-energize the unit

Check mark

Electric power disconnected

Check mark

Continuity through all fuses measured

Check mark

All electrical connections checked and are tight

Check mark

Resistance to ground for each circuit checked and is infinite

Check mark

Resistance phase to phase for each circuit checked

Check mark

All contactors checked

Run this procedureArrow right

Rooftop System Charge Maintenance

Check mark

Re-charge the unit

Check mark

The Rebel unit has many configurable options that can affect the refrigerant charge. Actual unit charge is given on the unit's data plate found on the inside of the control panel

Check mark

The Rebel unit uses electronic expansion valves that maintain peak efficiency. Liquid sub-cooling and suction super heat float and should not be used as an indication that charge needs to be added or removed from the system

Check mark

If a leak is suspected, the full charge should be removed and weighed. Weight should be compared against the unit nameplate data. Unit should be recharged with the amount given on the unit nameplate

Check mark

POE and PVE oil is hygroscopic and does absorb moisture when exposed to atmosphere. Steps should be taken to minimize exposure time to atmosphere during any maintenance where the sealed system is to be opened

Check mark

Rebel 003-015 refrigerant systems use only Polyvinylether (PVE) oil. Rebel 016-028 refrigerant systems use only Polyester (POE) oil

Check mark

NOTICE: Do not use POE oil in DPS 003-015 refrigerant systems and do not use PVE oil in DPS 016-028 refrigerant systems

Check mark

The entire system must be evacuated using a suitable vacuum pump

Check mark

The quality of vacuum is measured using a suitable micron gauge that has been calibrated

Run this procedureArrow right

2 Weekly Rooftop System Maintenance

Check mark

Prepare for storage control compartment

Check mark

Is the electronic control equipment in the unit stored in a 5% to 95% RH (non-condensing) environment?

Check mark

It may be necessary to put a heat source (light bulb) in the main control panel to prevent the accumulation of atmospheric condensate within the panel. The location and wattage of the heat source is dependent on local environmental conditions

Check mark

Is the heat source in the main control panel functional?

Check mark

Is the heat source adequate for current conditions?

Check mark

Check the control compartment every two weeks to confirm that the heat source is functional and is adequate for current conditions

Run this procedureArrow right

1 Monthly Coated Coil Cleaning

Check mark

Clean Option E Coated Coils

Check mark

WARNING: Prior to cleaning the unit, turn off and lock out the main power switch to the unit and open all access panels

Check mark

The following cleaning procedures are recommended as part of the routine maintenance activities for Option E Coated Coils. Documented routine cleaning of Option E Coated Coils is required to maintain warranty coverage.

Check mark

1. Remove Surface Loaded Fibers: Surface loaded fibers or dirt should be removed prior to water rinse to prevent further restriction of airflow.

Check mark

If unable to back wash the side of the coil opposite that of the coils entering air side, then surface loaded fibers or dirt should be removed with:

Check mark

NOTE: Use of a water stream, such as a garden hose, against a surface loaded coil will drive the fibers and dirt into the coil. This will make cleaning efforts more difficult. Surface loaded fibers must be completely removed prior to using low velocity clean water rinse.

Check mark

3. Periodic Clean Water Rinse: A monthly clean water rinse is recommended for coils that are applied in coastal or industrial environments to help to remove chlorides, dirt and debris. An elevated water temperature (not to exceed 130°F) will reduce surface tension, increasing the ability to remove chlorides and dirt. Pressure washer PSI must not exceed 900 psig and the nozzle should remain at least 1 foot from the coil to avoid damaging fin edges.

Check mark

Did you successfully complete the cleaning process?

Check mark

Sign off on the cleaning process

Run this procedureArrow right

9000 Hours / 6 Monthly Rooftop System Maintenance

Check mark

Check all moving parts for wear every six months

Check mark

The Rebel exhaust fans are direct drive variable speed fan/motor combination, which do not have belts or pulleys to maintain

Check mark

The bearings are permanently sealed and do not require periodic greasing. The Rebel 3-15 ton units have similar supply fans.

Check mark

The Rebel 16-28 tons supply fans have a direct drive motor

Check mark

These larger motors are not permanently sealed and will require greasing every 9000 hours

Check mark

Sign off on the 9000 Hours / 6 Monthly Rooftop System Maintenance

Run this procedureArrow right

Parts for Daikin Packaged Rooftop System DPS028AHME2PW-4

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Modulating Valve

M520B

Natural Gas Furnace

404231254

Staged Furnace

404231241

Natural Gas Fired Furnace

910166416

Staged Furnace

300049581

Modulating Valve

M520B

Natural Gas Furnace

404231254

Staged Furnace

404231241

Natural Gas Fired Furnace

910166416

Staged Furnace

300049581

Modulating Valve

M520B

Natural Gas Furnace

404231254

Staged Furnace

404231241

Natural Gas Fired Furnace

910166416

Staged Furnace

300049581

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets