MaintainX Logo
EnterprisePricing
Daikin

Daikin Indoor Cooling/Heating Unit FXMQ48PBVJU

Need answers fast?
Explore the manual using AI.

Daikin Indoor Cooling/Heating Unit FXMQ48PBVJU
Daikin Indoor Cooling/Heating Unit FXMQ48PBVJU

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Indoor Cooling/Heating Unit FXMQ48PBVJU

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Indoor Cooling/Heating Unit FXMQ48PBVJU

Daikin Indoor Cooling/Heating Unit FXMQ48PBVJU

Create an account to install this asset package.

Maintenance Plans for Daikin Indoor Cooling/Heating Unit Model FXMQ48PBVJU

Integrate maintenance plans directly into your work orders in MaintainX.

Heat Recovery System Vacuuming/Dehydration Maintenance

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Choose the type of vacuuming and dehydration

Check mark

Enter the vacuum pump reading after 2 hours of operation

Check mark

Did the vacuum reach –100.7 kPa (–14.6 psi) or less after 2 hours?

Check mark

Enter the vacuum pump reading after additional 1 hour of operation (if required)

Check mark

Did the vacuum reach –100.7 kPa (–14.6 psi) or less after 3 hours?

Check mark

Did the leak tests pass (if conducted)?

Check mark

Enter the vacuum gauge reading after leaving the compressor in vacuum state for 1 hour

Check mark

Did the vacuum gauge reading rise after leaving the compressor in vacuum state for 1 hour?

Run this procedureArrow right

Superheat Operation Check

Check mark

Superheating temperature control in cooling is conducted by indoor unit electronic expansion valve

Check mark

Is the indoor unit electronic expansion valve functioning properly?

Check mark

Superheating temperature control in heating is conducted by outdoor unit electronic expansion valve (main)

Check mark

Is the outdoor unit electronic expansion valve functioning properly?

Check mark

Judgement criteria of superheat operation: Suction gas superheated degree: 10°C (50°F) and over. Discharge gas superheated degree: 45°C (113°F) and over, except immediately after compressor starts up or is running under drooping control

Check mark

Enter the suction gas superheated degree

Check mark

Enter the discharge gas superheated degree

Check mark

Does the superheat operation meet the judgement criteria?

Check mark

Enter any additional observations or comments

Run this procedureArrow right

Electronic Expansion Valve Coil Check

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Electronic Expansion Valve Coil checked

Check mark

Remove the connector for electronic expansion valve (X7A) from PCB

Check mark

Measure the resistance value between pins

Check mark

No continuity between White and Yellow

Check mark

Resistance value between White and Orange

Check mark

Resistance value between White and Red

Check mark

Resistance value between Yellow and Blue

Check mark

Resistance value between Yellow and Brown

Run this procedureArrow right

Pressure Check

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Compressor PI control in cooling

Check mark

Low pressure protection control

Check mark

Hot gas bypass control

Check mark

Superheated degree control in cooling

Check mark

Superheated degree control in heating

Check mark

Sign off on the pressure check

Run this procedureArrow right

Power Transistor Check

Check mark

Power OFF

Check mark

All wiring removed from the PCB where power transistors are mounted on

Check mark

Analog type of multimeter prepared

Check mark

Power supply turned OFF and 10 minutes or more have passed before resistance measurement

Check mark

Measurement made in resistance measurement mode in the x1 kΩ range when using the analog type of multimeter

Check mark

Measurement made in diode check mode when using the digital type of multimeter

Check mark

Sign off on the power transistor check

Run this procedureArrow right

Parts for Daikin Indoor Cooling/Heating Unit FXMQ48PBVJU

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Junction Pipe Kit

KHRP26A250T

Junction Pipe Kit

KHRP26A250T

Junction Pipe Kit

KHRP26A250T

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets