

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Cotes A/S Dehumidifier CR290B
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Monthly Dehumidifier Maintenance
Filter Maintenance
Check or replace the filters
Fan Operation Check
Are the fans operating?
Dehumidifier Maintenance
Component Checks
Replace air filters
Check the rotation of the rotor
Enter the power consumption of the electric heater
Airflow Adjustment
Dry Air Flow Adjustment
Is a damper installed in the dry air duct?
Enter the nominal regeneration airflow (m3/h) from table 1
Is the airflow reduced on the damper to obtain the nominal regeneration airflow?
Regeneration Air Flow Adjustment
Start with the damper in the closed position
Enter the amperemeter value (A) after opening the damper to optimal value
Is the amperemeter value optimal after 15 minutes of operation?
Adjust the damper again if necessary
Duct System Check
Safety Precautions
Ensure only trained/authorised electricians perform work in the electrical box
Switch off the power supply at the mains switch before opening the electrical box
Duct System Inspection
Verify installation of dampers
Do the regeneration air outlet ducts drain away from the dehumidifier?
If not draining away, is there a 6mm-diameter hole in the lowest part of the duct for water drainage?
Electrical Installation Check
Safety Precautions
Ensure only trained/authorised electricians perform the work
Switch off the power supply at the mains switch before opening the electrical box
Pre-startup Electrical Installation Check
Check that all electrical connections are made correctly
Plug in the necessary cables
Switch Operation for Units with Two Switch Buttons
Push the toggle switch S1 (red) to position 'I'
Set the toggle switch S2 (black)
Access the parts list for your equipment in MaintainX.
Drive Belt
132104
Hose Ø83
130635
Insulator For Heating Element
132313
Filter
130259
Rotor
124059
Drive Belt
132104
Hose Ø83
130635
Insulator For Heating Element
132313
Filter
130259
Rotor
124059
Drive Belt
132104
Hose Ø83
130635
Insulator For Heating Element
132313
Filter
130259
Rotor
124059
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













