Cameron Gate Valve WKM 109

Need answers fast?
Explore the manual using AI.

Cameron Gate Valve WKM 109
Cameron Gate Valve WKM 109

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Cameron Gate Valve WKM 109

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Cameron Gate Valve WKM 109

Cameron Gate Valve WKM 109

Create an account to install this asset package.

Maintenance Plans for Cameron Gate Valve Model WKM 109

Integrate maintenance plans directly into your work orders in MaintainX.

1 Monthly Gate Valve Test

Check mark

Visual Inspection

Check mark

Inspect the Pow-R-Seal Gate Valve for any visible damage or wear.

Check mark

Refer to the troubleshooting section (page 13) for temporary solutions to identified problems.

Check mark

Valve Operation

Check mark

Was the valve operated through a full open-close cycle?

Check mark

If a full cycle was not possible, was a partial cycle performed?

Check mark

Sealant, Lubricant, and Anti-freeze Check

Check mark

Verify compatibility of sealant, lubricant, or anti-freeze with the valve trim and product in the line.

Check mark

Thermal Relief System Maintenance

Run this procedureArrow right

1 Yearly Gate Valve Lubrication

Check mark

Preparation

Check mark

Ensure grease gun is equipped with a pressure gauge

Check mark

Is the grease gun kept in a heated area?

Check mark

Valve Positioning

Check mark

Move the valve to the closed position

Check mark

Safety Cap Removal

Check mark

Remove the safety caps on the seat lubrication fitting using a wrench

Check mark

Lubrication Process

Check mark

Connect the grease gun to the seat lubrication fitting(s)

Run this procedureArrow right

6 Monthly Gate Valve Relief System Inspection

Check mark

Visual Inspection

Check mark

Inspect Pow-R-Seal Gate Valves for visual abnormalities

Check mark

Inspect thermal relief system for visual abnormalities

Check mark

Operational Check

Check mark

Was the valve operated through a full open-close cycle?

Check mark

Sealant, Lubricant, and Anti-freeze Compatibility Check

Check mark

Is the sealant compatible with the valve trim and product in the line?

Check mark

Is the lubricant compatible with the valve trim and product in the line?

Check mark

Is the anti-freeze compatible with the valve trim and product in the line?

Run this procedureArrow right

Check Valve Test

Check mark

Visual Inspection

Check mark

Visually inspect the Pow-R-Seal Gate Valves for any signs of wear or damage.

Check mark

Refer to troubleshooting section (page 13) for temporary solutions to identified problems.

Check mark

Valve Operation

Check mark

Operate the valve through a full open-close cycle, if practical.

Check mark

Operate the valve through a partial cycle as a minimum.

Check mark

Sealant, Lubricant, and Anti-freeze Compatibility

Check mark

Verify compatibility of sealant, lubricant, or anti-freeze with the valve trim and product in the line.

Check mark

Thermal Relief System Maintenance

Run this procedureArrow right

1 Yearly Vee-Packing Maintenance

Check mark

Initial Inspection

Check mark

Inspect the valve for evidence of stem leakage.

Check mark

Check for paint discoloration around the bonnet-yoke tube joint.

Check mark

Packing Addition

Check mark

Add one stick of packing to keep the packing pliable.

Check mark

Enter the number of packing sticks added.

Check mark

Leakage Handling - Stick Method

Check mark

Remove the injection stinger from the packing fitting.

Check mark

Apply a good grade of bearing grease to the threads.

Run this procedureArrow right

Parts for Cameron Gate Valve WKM 109

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Screw / Prime Hand Gun

2122495-01

Bucket-Type Gun

K065189

Adapter Fitting

K296434

Screw / Prime Hand Gun

2122495-01

Bucket-Type Gun

K065189

Adapter Fitting

K296434

Screw / Prime Hand Gun

2122495-01

Bucket-Type Gun

K065189

Adapter Fitting

K296434

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.