

The Bunn Hot Water Dispenser HW 2 is a reliable and efficient solution for high-demand environments, providing instant hot water for various applications. With its robust design and user-friendly features, this model ensures optimal performance and durability, making it an essential asset for commercial kitchens and beverage service operations.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Bunn Hot Water Dispencer HW 2
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Hot Water Dispencer Electronic Control Replacement
Remove all wires from the electronic control board terminals
Remove the six 6-32 screws holding the electronic control board to the component bracket
Disconnect the temperature sensor, overflow tube temperature sensor, and indicator wires from the electronic control board
Attach the temperature sensor, overflow tube temperature sensor, and indicator wires to the electronic control assembly
Fasten the new electronic control board to its bracket
Upload a photo of the reconnected wires
Refer to Fig 2 when reconnecting the wires
Review the initial set-up procedures on page 6
Sign off on the electronic control replacement
Hot Water Dispencer Liquid Level Control Test
Warning: This procedure requires trained personnel with PPE!
Disconnect the dispenser from the power source
Voltage across terminals 3 & 4 of the electronic control board
Voltage range
Voltage present as described
If voltage was not present as described, check the dispenser wiring harness
Remove the pink wire from terminal 5 of the electronic control assembly
Voltage across terminals 1 & 4 of the electronic control board
Voltage range
Hot Water Dispencer Temperature Control Test
Warning: Disconnect the dispenser from the power source before starting the test
Voltage across terminals 3 & 4 of the electronic control circuit board within the correct range
Voltage across the tank heater terminals within the correct range
Was voltage present as described in the first test?
If voltage was not present as described, contact Bunn-O-Matic to order an electronic control board and temperature sensor for evaluation and proceed to next step
Replace the electronic control board
Voltage across the tank heater terminals within the correct range after replacing the electronic control board
Was voltage present as described in the second test?
If voltage was present as described, the temperature control of the system is operating properly. Return the new electronic control board or temperature sensor to Bunn-O-Matic for credit
Hot Water Dispenser Contactor Test
Warning: Disconnect the dispenser from the power source before starting the test
Disconnect the black wire from the contactor coil to the limit thermostat and black wire from the red wire on the main harness on two wire 240V models
Voltage across the red wire and black wire
Voltage reading
If voltage is not as described, check the wiring harness
Check for continuity between the left and right terminals on the contactor coil
If continuity is not as described, replace the contactor
Voltage across the upper left terminal and the upper right terminal on the contactor
Voltage reading
Hot Water Dispenser Dispense Switch Replacement
Disconnect the dispenser from the power source
Remove the top cover (3 screws) and front shroud assembly (4 screws)
Remove the top 2 screws and loosen 2 lower screws securing control panel to shroud
Disconnect switch wires from the CBA
Remove the large nut securing the switch
Installation in the reverse order
Sign off on the switch replacement
Access the parts list for your equipment in MaintainX.
Limit Thermostat
23717.0003
Limit Thermostat
23717.0003
Limit Thermostat
23717.0003
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













