MaintainX Asset Hub logo
EnterprisePricing
Buckeye

Buckeye Wheeled Fire Extinguisher S-350-PT 350 lb. STD.

Need answers fast?
Explore the manual using AI.

Buckeye Wheeled Fire Extinguisher S-350-PT 350 lb. STD.
Buckeye Wheeled Fire Extinguisher S-350-PT 350 lb. STD.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Buckeye Wheeled Fire Extinguisher S-350-PT 350 lb. STD.

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Buckeye Wheeled Fire Extinguisher S-350-PT 350 lb. STD.

Buckeye Wheeled Fire Extinguisher S-350-PT 350 lb. STD.

Create an account to install this asset package.

Maintenance Plans for Buckeye Wheeled Fire Extinguisher Model S-350-PT 350 lb. STD.

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Fire Extinguisher Maintenance

Check mark

Preparation and Safety Precautions

Check mark

Ensure the extinguisher is in the upright position and located in a suitable area for maintenance.

Check mark

Verify that the extinguisher has been blown down and all pressure is relieved from the agent cylinder and hose assembly.

Check mark

Install a safety shipping cap on nitrogen cylinders if removed for storage or transportation.

Check mark

Initial Examination

Check mark

Examine the overall condition of the extinguisher for mechanical damage, corrosion, or missing parts.

Check mark

Check the extinguisher’s nameplate for legibility and secure fastening.

Check mark

Enter the agent cylinder’s date of manufacture to determine if a 12-year hydrostatic retest is necessary.

Check mark

Enter the nitrogen cylinder’s date of manufacture to determine if a 5 or 10-year hydrostatic retest is necessary.

Run this procedureArrow right

12 Yearly Hydrostatic Test

Check mark

Pre-Test Inspection

Check mark

Inspect for mechanical injury, damage, or corrosion

Check mark

Is there evidence of corrosion penetrating into the pressure vessel?

Check mark

Is there evidence of mechanical injury or damage?

Check mark

Cylinder Testing

Check mark

Remove agent cylinder safety relief, siphon tube, and gas tube

Check mark

Ensure extinguisher fill cap is used and remains on the cylinder during testing

Check mark

Record hydrostatic retest pressure for agent cylinders (480 PSI)

Check mark

Was the cylinder tested by qualified and trained personnel?

Run this procedureArrow right

30 Daily Fire Extinguisher Inspection

Check mark

Location and Accessibility

Check mark

Ensure the extinguisher is in its designated place and easily mobilized.

Check mark

Ensure there are no obstructions preventing visual location or access to the extinguisher.

Check mark

Visual and Physical Inspection

Check mark

Ensure the operating instructions on the nameplate are legible and facing outward.

Check mark

Check that the visual inspection lead wire safety seals are intact.

Check mark

Examine the unit for missing/loose parts, physical damage, corrosion, or leakage.

Check mark

Inspect the discharge nozzle for obstructions and ensure the operating handle is in the closed position.

Check mark

Pressure and Fullness Check

Run this procedureArrow right

Extinguishing Agent Replacement

Check mark

Pre-Recharge Safety Checks

Check mark

Ensure extinguisher has been blown down and all pressure relieved from agent cylinder and hose assembly.

Check mark

Verify nitrogen cylinder valve is not accidentally pulled, especially if it is a 'quick-release' type.

Check mark

Extinguisher Preparation

Check mark

Locate the extinguisher in a dry area.

Check mark

Follow the appropriate model extinguisher maintenance procedures.

Check mark

Agent Cylinder Filling

Check mark

Ensure the agent cylinder is properly filled with the correct amount and type of Buckeye Fire Equipment dry chemical agent.

Check mark

Expellant Gas Cylinder Replacement

Run this procedureArrow right

Parts for Buckeye Wheeled Fire Extinguisher S-350-PT 350 lb. STD.

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Fill Cap, Cylinder

900834

Gasket, Fill Cap

900835

Safety Disc Assembly

900242

Nitrogen Hose Assembly

300397

Nitrogen Cylinder Assembly Charged – 23 Cu ft W/Cap, Gauge

900846

Fill Cap, Cylinder

900834

Gasket, Fill Cap

900835

Safety Disc Assembly

900242

Nitrogen Hose Assembly

300397

Nitrogen Cylinder Assembly Charged – 23 Cu ft W/Cap, Gauge

900846

Fill Cap, Cylinder

900834

Gasket, Fill Cap

900835

Safety Disc Assembly

900242

Nitrogen Hose Assembly

300397

Nitrogen Cylinder Assembly Charged – 23 Cu ft W/Cap, Gauge

900846

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Buckeye

Explore Other Assets