MaintainX Logo
EnterprisePricing
Baltimore Aircoil Company

Baltimore Aircoil Company Cooling Tower 3371C

Need answers fast?
Explore the manual using AI.

Baltimore Aircoil Company Cooling Tower 3371C
Baltimore Aircoil Company Cooling Tower 3371C

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Baltimore Aircoil Company Cooling Tower 3371C

Baltimore Aircoil Company Cooling Tower 3371C

Create an account to install this asset package.

Maintenance Plans for Baltimore Aircoil Company Cooling Tower Model 3371C

Integrate maintenance plans directly into your work orders in MaintainX.

1 Monthly Cooling Tower Maintenance

Check mark

Inspect and clean as necessary

Check mark

Inspect general condition of the unit and check unit for unusual noise or vibration.

Check mark

When operating in ambient temperatures below freezing, the unit should be inspected more frequently.

Check mark

Ensure all controls for capacity and freeze protection are set properly and functioning normally.

Check mark

Prevent excessively high water levels and possible overflow of the cold water basin due to over pumping, clogged strainers, or make-up valve malfunction.

Check mark

Resolve any icing conditions that may damage the unit or the supports, impair the system performance, or create a safety hazard.

Check mark

Inspect air intake louvers/Combined inlet shields

Check mark

Check and adjust water level in cold water basin

Check mark

Check operation of make-up

Run this procedureArrow right

1 Weekly Gear Drive Oil Check

Check mark

DANGER: Do not perform any service on or near the fans, motors, and drives, or inside the unit without first ensuring that the fans and pumps are disconnected, locked out, and tagged out.

Check mark

Check oil level weekly with the unit idle. On units supplied with an external sight gauge, check the oil level of the external sight gauge and the sight gauge on the gear drive to ensure that the proper amount of oil is in the gear drive.

Check mark

If equipped with an external oil line and site gauge, check weekly to make sure the breather hole at the top of the sight gauge is open.

Check mark

Sign off on the weekly gear drive oil check

Run this procedureArrow right

3 Monthly / 2000 Hourly Fan Shaft Bearings Lubrication

Check mark

Warning: Ensure that the fans and pumps are disconnected, locked out, and tagged out before performing any service.

Check mark

Are the two pillow block ball bearings supporting the fan shaft present?

Check mark

Is each bearing equipped with a lubrication fitting and a slinger/locking collar to keep out moisture?

Check mark

Select the type of grease used for lubrication

Check mark

Was the lubrication done with a manual grease gun or BAC’s optional Automatic Bearing Greaser?

Check mark

Was high-pressure grease gun avoided to prevent rupturing the bearing seals?

Check mark

Sign off on the fan shaft bearings lubrication

Run this procedureArrow right

Cooling Tower Maintenance

Check mark

Start-up Procedure:

Check mark

Inspect and clean as necessary:

Check mark

· Inspect general condition of the unit and check unit for unusual noise or vibration

Check mark

· Inspect cold and hot water basins

Check mark

· Flush water distribution system/Inspect spray nozzles

Check mark

· Drain basin and piping

Check mark

· Inspect air intake louvers/Combined inlet shields

Check mark

· Check and adjust water level in cold water basin

Check mark

· Check operation of make-up valve

Run this procedureArrow right

1 Yearly Cooling Tower Maintenance

Check mark

DANGER: Do not perform any service on or near the fans, motors, and drives, or inside the unit without first ensuring that the fans and pumps are disconnected, locked out, and tagged out.

Check mark

Inspect unit finish

Check mark

Check drive alignment

Check mark

Check the drive alignment annually to ensure maximum belt life.

Check mark

Place a straight edge across the driver and the driven sheaves as shown in Figure 4a for standard drives and in Figure 4b for the BALTIGUARD™ Fan System or the BALTIGUARD PLUS™ Fan System.

Check mark

The straight edge should contact all four points as shown in Figure 4a indicating that the drives are properly aligned.

Check mark

There should be no more than 1/16” deviation from the four points of contact.

Check mark

In case of realignment, loosen the motor sheave, and align it with the fan sheave. Allow 1/4” for draw-up as the bushing screw is retightened.

Check mark

Check optional basin heater and stand alone BAC heater control panel

Run this procedureArrow right

Parts for Baltimore Aircoil Company Cooling Tower 3371C

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Anti-Seize Grease

160069

Paint

160133

3M™ Windo-Weld™ Super Fast Urethane

RK1015

Anti-Seize Grease

160069

Paint

160133

3M™ Windo-Weld™ Super Fast Urethane

RK1015

Anti-Seize Grease

160069

Paint

160133

3M™ Windo-Weld™ Super Fast Urethane

RK1015

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Baltimore Aircoil Company

Explore Other Assets