MaintainX Asset Hub logo
EnterprisePricing
Baker Hughes

Baker Hughes Energy Management Control Valve 49000 Series

Need answers fast?
Explore the manual using AI.

Baker Hughes Energy Management Control Valve 49000 Series
Baker Hughes Energy Management Control Valve 49000 Series

The Baker Hughes Energy Management Control Valve 49000 Series is designed for precision flow control in industrial applications. This robust valve ensures optimal performance and reliability, making it essential for energy management systems. Regular maintenance and the right spare parts are crucial for its longevity and efficiency.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Baker Hughes Energy Management Control Valve 49000 Series

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Baker Hughes Energy Management Control Valve 49000 Series

Baker Hughes Energy Management Control Valve 49000 Series

Create an account to install this asset package.

Maintenance Plans for Baker Hughes Energy Management Control Valve Model 49000 Series

Integrate maintenance plans directly into your work orders in MaintainX.

Gaskets Maintenance

Check mark

- Gasket seating surfaces must be free of dents, scratches, corrosion, or other types of damage. Clean mating surfaces as required and replace any non-conforming parts. Spiral wound gaskets (10) must always be replaced after disassembly.;

Run this procedureArrow right

Guiding Surfaces Maintenance

Check mark

Guiding surfaces of the cage, valve plug, guide bushing, plug stem, and auxiliary pilot plug must be checked.

Check mark

- If there are only slight wear indications, then gently use a light abrasive, such as fine grit sandpaper, to smooth out guiding surfaces.

Check mark

- Parts with greater damage or wear on the guiding surfaces must be replaced.

Run this procedureArrow right

Metal Seal Maintenance

Check mark

For the two-piece bonnet configurations: - Prior to reassembly, the metal seal (11) should be inspected for cracks or signs of wear.

Check mark

- The metal seal can be reused if it is free from scratches, erosion, corrosion, or any other type of damage.

Check mark

- If slight wear exists on the metal seal, a new layer of coating should be re-applied to the original condition by the factory or a Masoneilan Authorized Repair Center.

Check mark

- Prior to reassembly of the valve, inspect the inside of the valve body around the area where the metal seal seats. It is common to find slight ridges or depressions from where the seal was originally seated.

Check mark

- To prevent this potential leakage, machine the seating angle of the bonnet at 40 degrees by approximately 0.1 inches (2.5 mm) deep, thus causing the metal seal to seat further down inside the valve body (on a new un-deformed surface). Refer to Figure 4 for details.

Check mark

- If this procedure is required more than twice, please consult the factory.;

Run this procedureArrow right

Packing Box Maintenance

Check mark

- Tight sealing within the packing box is obtained by compression of the packing (15). Compression must be achieved by evenly tightening the packing flange nuts (19) on the packing flange (17). Periodic re-tightening of the packing flange nuts may be required to maintain proper sealing.

Check mark

- Be careful not to over tighten the packing as this could prevent proper operation of the valve. If leakage persists after maximum packing compression, then the packing needs to be changed.;

Run this procedureArrow right

PTFE Packing Maintenance

Check mark

- Carbon/PTFE and pure PTFE packing rings are cut in such a way that they can be replaced without having to separate the valve plug stem from the actuator stem.

Check mark

- Unscrew and remove the packing flange nuts (19).

Check mark

- Lift the packing flange (17) and packing follower (16) up along the valve stem (8).

Check mark

- By means of a puller, remove the packing (15) being careful not to damage the sealing surface of the packing box or the valve plug stem.

Check mark

- Replace the packing rings, placing the cut in each ring about 120° apart from the adjacent ring. Press rings in one at a time.

Check mark

- Reassemble the packing follower (16) and the packing flange (17).

Check mark

- Tighten the packing flange nuts (19) without over compressing the packing rings.

Check mark

- Put the valve back into service and check for leakage.

Check mark

- Tighten packing flange nuts (19) as required.

Run this procedureArrow right

Parts for Baker Hughes Energy Management Control Valve 49000 Series

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Actuator Stem

-

Anti-Extrusion Ring

-

Backup Ring

-

Balance Seal

-

Body

-

Actuator Stem

-

Anti-Extrusion Ring

-

Backup Ring

-

Balance Seal

-

Body

-

Actuator Stem

-

Anti-Extrusion Ring

-

Backup Ring

-

Balance Seal

-

Body

-

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Baker Hughes

Explore Other Assets