MaintainX Asset Hub logo
EnterprisePricing
AXXAIR

AXXAIR Closed Orbital TIG Welding Head SATFX-115-CA01

Need answers fast?
Explore the manual using AI.

AXXAIR Closed Orbital TIG Welding Head SATFX-115-CA01
AXXAIR Closed Orbital TIG Welding Head SATFX-115-CA01

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for AXXAIR Closed Orbital TIG Welding Head SATFX-115-CA01

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

AXXAIR Closed Orbital TIG Welding Head SATFX-115-CA01

AXXAIR Closed Orbital TIG Welding Head SATFX-115-CA01

Create an account to install this asset package.

Maintenance Plans for AXXAIR Closed Orbital TIG Welding Head Model SATFX-115-CA01

Integrate maintenance plans directly into your work orders in MaintainX.

6 Monthly Absence Check

Check mark

Ensure machine is powered down (main power disconnected)

Check mark

Disassemble and Clean Welding Head

Check mark

Completely disassemble the welding head

Check mark

Perform a complete cleaning of the transmission, from the motor to the rotor

Check mark

Remove all traces of grease or other debris

Check mark

Inspect Pinions

Check mark

Check the integrity of the pinions

Check mark

Check the toothing for irregular wear, burrs, or sharp edges

Check mark

Check the pinion fixings for play (axial and radial)

Run this procedureArrow right

6 Monthly Abnormal Noise Maintenance

Check mark

Machine Operation Check

Check mark

Ensure the machine is live and operating

Check mark

Perform a complete rotation of the welding machine rotor from the generator screen

Check mark

Perform a complete rotation of the welding machine rotor from the buttons on the welding head

Check mark

Noise Inspection

Check mark

Check for any abnormal noise during operation

Check mark

Did any abnormal noise occur during operation?

Run this procedureArrow right

Welding Glass Replacement

Check mark

Preparation

Check mark

Ensure the workbench is clean and flat

Check mark

Cut off the general power supply of the machine

Check mark

Disconnect the welding generator unit

Check mark

Tools Required

Check mark

Ensure the following tool is available

Check mark

Welding Glass Removal

Check mark

Remove the two fixing screws from the spring clips using the 2.0mm BTR wrench

Check mark

Remove the used or damaged welding glass

Run this procedureArrow right

6 Monthly Welding Head Cable Check

Check mark

Preparation

Check mark

Switch off the machine (disconnect the main power supply)

Check mark

Cleaning

Check mark

Brush or rag clean the entire welding cable

Check mark

Inspection

Check mark

Visually inspect all hoses

Check mark

Check that no hose is bent, pinched, worn, or shows any signs of tearing, or herniation

Check mark

Check for leaks (coolant or gas) or noise that may reveal a leak

Check mark

Check that all connections are tight

Run this procedureArrow right

Closed Orbital TIG Welding Head Cleaning

Check mark

Preparation

Check mark

Ensure the workbench is clean and flat

Check mark

Cut off the general power supply of the machine

Check mark

Disconnect the welding generator unit

Check mark

Tools Required

Check mark

Gather the necessary tools

Check mark

Disassembly of the Head

Check mark

Remove coolant connection and secure the 2 caps

Check mark

Ensure the 4 red seals are not lost and left in place

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from AXXAIR

Explore Other Assets