

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Antunes Vertical Contact Toaster VCTM-2
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Conveyor Belt Chain Check Replacement
Preparation
Turn the power off and unplug the power cord
Allow the unit to cool before proceeding
Disassembly
Remove the Butter Wheel and Pan (if present)
Remove the Bun Chute
Set the Compression Control Knobs to 6 & 6
Open both Conveyor Covers
Remove both Belt Wraps and set aside
1 Daily Vertical Contact Toaster Cleaning
Preparation
Turn the power OFF and unplug the power cord
Ensure the release sheet and belts wraps are warm before cleaning
Remove and Wash Accessories
Put on heat-resistant gloves
Remove accessories
Wash, rinse, and sanitize accessories
Release Sheet Maintenance
Remove the release sheet and place it on a clean, flat dry surface
3 Monthly Vertical Contact Toaster Cleaning
Turn unit off
Unplug the power cord
Allow the unit to cool before proceeding
Remove accessories
Put on heat-resistant gloves
Remove the Butter Wheel and Butter pan (if present)
Remove the Heat Shield
Set the bun thickness compression knobs to 6 & 6
Remove belt wrap pin
3 Monthly Conveyor Belt Chain Check
Preparation
Turn the unit off
Unplug the power cord
Allow the unit to cool
Disassembly
Remove the following components
Set the Bun Thickness Compression Knobs to 6 & 6
Open both Conveyor Covers
Remove the Belt Wraps and set aside
3 Monthly Roller Tensioner Replacement
Tensioner Removal
Push down on retaining tab of the tensioner
Slide the tensioner out of the guide plate while keeping pressure on the retaining tab
Tensioner Replacement
Slide the new tensioner into the guide plate
Post Replacement Check
Is the new tensioner securely in place?
Check for any unusual noises after replacement
Finalization
Access the parts list for your equipment in MaintainX.
Conveyor Belt Assembly 37/2
7001135
Roller Tensioner Assembly
7001593
Roller Tnesioner Assembly
0013373
Tensioner Bracket Weldment - Right
0022694
Tensioner Bracket Weldment - Left
0507840
Conveyor Belt Assembly 37/2
7001135
Roller Tensioner Assembly
7001593
Roller Tnesioner Assembly
0013373
Tensioner Bracket Weldment - Right
0022694
Tensioner Bracket Weldment - Left
0507840
Conveyor Belt Assembly 37/2
7001135
Roller Tensioner Assembly
7001593
Roller Tnesioner Assembly
0013373
Tensioner Bracket Weldment - Right
0022694
Tensioner Bracket Weldment - Left
0507840
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













