

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Atlas Copco Screw Air Compressor ZT110
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Air FIlter Change
Stop the compressor and press the emergency stop button
Switch off the voltage and follow the LOTO procedure
Remove nuts
Loosen clamps
Take out filter housing with filter element
Replace the dirty filter element with a new one
Put the filter housing with the filter element back into place
Tighten clamps and nuts
Switch on the voltage
8000 Hourly / 1 Yearly Oil and Oil Filter Change
Run the compressor until warm
Stop the compressor. Press the emergency stop button
Switch off the voltage and follow the LOTO procedure
Remove filler plug (FC). Drain the compressor sump by opening drain valve (Dmo). On ZR compressors, drain the oil cooler by opening drain valve (Dmc). On ZT compressors, fit a proper flexible over the extension of drain plugs (Dmc). Drain the oil system by loosening the drain plugs. Close the drain valves and tighten the drain plugs after draining
Remove the oil filters (OF). Clean the filter seats, oil the gaskets of the new filters and screw the filters into place until the gaskets contact the seats. Then tighten by hand
On ZR 110 up to ZR 275, fill the compressor sump to the middle of the oil level sight-glass (SG). On ZT 110 up to ZT 275, fill the compressor sump to the maximum mark of the oil level sight-glass
Reinstall the filler plug
Switch on the voltage. Unlock the emergency stop button and reset the oil and oil filter service warnings
Run the compressor for a few minutes
500 Hourly / 3 Monthly Cooler Cleaning
Stop the compressor
Depressurize the air system
Remove the compressor roof
Remove any dirt form the coolers with a fibre brush in the direction of the fins
Remove dirt from the fans
Clean the coolers with an air jet in the reverse direction to normal flow (i.e. from the outside to the inside of the compressor). Use low pressure air. If required, the pressure may be increased up to 6 bar(e) (87 psig)
If it is required to clean the coolers with a cleaning agent, consult your Atlas Copco Customer Center
Re-install the compressor roof
Sign off on the cooler cleaning
16000 Hourly / 2 Yearly Screw Air Compressor Maintenance
Replace the demister sponge of the integrated dryer
Inspect the dryer heater
Inspect the dryer rotor
Safety Valve Testing
Warning: Never run the compressor without safety valves. No adjustments are allowed.
Valve tested on a separate compressed air line
Valve opens at the pressure specified in Settings of safety valves
If a valve does not open at the specified pressure, describe the issue
Sign off on the safety valve testing
Access the parts list for your equipment in MaintainX.
Roto-Z Lubricating Oil 5 l Can
2908 8503 00
Roto-Z Lubricating Oil 20 l Can
2908 8501 01
Roto-Z Lubricating Oil 209 l Drum
2908 8500 00
Roto-Z Lubricating Oil 5 l Can
2908 8503 00
Roto-Z Lubricating Oil 20 l Can
2908 8501 01
Roto-Z Lubricating Oil 209 l Drum
2908 8500 00
Roto-Z Lubricating Oil 5 l Can
2908 8503 00
Roto-Z Lubricating Oil 20 l Can
2908 8501 01
Roto-Z Lubricating Oil 209 l Drum
2908 8500 00
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













