MaintainX Asset Hub logo
EnterprisePricing
Ametek

Ametek Combustion Analyzer WDG-VC OC1C

Need answers fast?
Explore the manual using AI.

Ametek Combustion Analyzer WDG-VC OC1C
Ametek Combustion Analyzer WDG-VC OC1C

The Ametek Combustion Analyzer WDG-VC OC1C is a high-performance industrial tool designed for precise combustion analysis. This advanced analyzer ensures optimal efficiency and compliance in various applications, making it essential for maintenance professionals in the field.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Ametek Combustion Analyzer WDG-VC OC1C

Ametek Combustion Analyzer WDG-VC OC1C

Create an account to install this asset package.

Maintenance Plans for Ametek Combustion Analyzer Model WDG-VC OC1C

Integrate maintenance plans directly into your work orders in MaintainX.

90 Daily Analyzer Calibration

Check mark

WARNING: Before working on the analyzer, read the entire procedure you will be performing to learn how to safely perform maintenance on and troubleshoot the WDG-V Analyzer

Check mark

WARNING: Before performing any maintenance, service, or troubleshooting on the analyzer, review and follow all safety information

Check mark

CAUTION: Preventing leaks in the sample system is critical to proper analyzer operation. Most leaks are preventable with regular cleaning and replacement of wetted parts

Check mark

CAUTION: If you turn off the analyzer or the process is shut down, turn off the aspirator air to avoid plugging problems

Check mark

CAUTION: When working on analyzer plumbing, always use a backup wrench to prevent damage to welds and distortion to analyzer plumbing

Check mark

CAUTION: Never use pipe dope or any other contaminant that gives off a combustible vapor on any joints of the sample tubing. Combustible vapor in the sample tubing can lead to erroneous readings

Check mark

The outside of the analyzer cover and all analyzer assembly components are hot during normal operation (up to 260 °C/500 °F inside the cover), even after a considerable period following shut-down. Allow analyzer components to cool for at least 90 minutes before working inside the analyzer. Use caution and wear appropriate gloves when handling components or when touching the analyzer cover

Check mark

WARNING: Be extremely careful when performing maintenance on the analyzer while the process is running, especially if the process is under significant positive pressure. Removing any part of the analyzer plumbing can allow process gases and gases of high temperature to escape into the analyzer

Check mark

Check calibration of the analyzer

Run this procedureArrow right

Analyzer Maintenance

Check mark

Warning: Always turn off power before cleaning the enclosure

Check mark

Analyzer power turned off?

Check mark

Choose the type of service done

Check mark

CAUTION: Disconnect power from the analyzer and control unit and allow it to cool before replacing its parts

Check mark

Analyzer power disconnected and cooled down?

Check mark

Analyzer cover opened?

Check mark

Isolation valves on the inlet and outlet of the process closed?

Check mark

Cell clips removed?

Check mark

Cell assembly removed?

Run this procedureArrow right

Block Heater Replacement

Check mark

Warning: Only perform this procedure on Combustibles/Methane Units

Check mark

Disconnect heater wires

Check mark

Loosen the 4.0 mm hex screw

Check mark

Remove the Combustibles Block Heater by sliding it out

Check mark

Replace the Block Heater

Check mark

Tighten the hex screw into place

Check mark

Reconnect the wires on the Sensor board

Check mark

Sign off on the block heater replacement

Run this procedureArrow right

Box Heater Replacement

Check mark

NOTE: There is only one heater in the O, version. There are two heaters in the Combustibles/Methane version of the WDG-V

Check mark

Disconnect heater wires

Check mark

Remove the speed clip from the mounting tab. Use needle-nose pliers to remove the clip

Check mark

Remove the box heater by sliding it out

Check mark

Replace the box heater

Check mark

Attach a new speed nut to the post

Check mark

Reconnect the wires on the Sensor board

Check mark

Sign off on the box heater replacement

Run this procedureArrow right

Combustibles Detector Replacement

Check mark

NOTE: The Combustibles Detector will always face outward, and the Methane detector will always face inward from the factory.

Check mark

Disconnect the Combustibles Detector wires from the terminal block labeled Cact and Cref

Check mark

Select the type of Combustibles Detector

Check mark

Loosen the two (2) 4.0 mm hex screws that hold the Combustibles Detector in place and remove the detector from its housing. Save the screws from the detector to use when installing the new Combustibles Detector

Check mark

Always use a new o-ring when the Combustibles Detector has been removed

Check mark

Install the new Combustibles Detector in place, aligning the two s (2) crews on the Heater Block. Be careful not to damage the detector element ends while inserting the assembly. Tighten screws until face is flush with the block and gasket is fully compressed

Check mark

Reconnect the detector leads to the Sensor board

Check mark

Sign off on the Combustibles Detector Replacement

Run this procedureArrow right

Parts for Ametek Combustion Analyzer WDG-VC OC1C

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Analyzer Main Processor Board

8000-148-SE

Analyzer Main Processor Board

8000-119-SE

Aspirator Air Solenoid Valve

36090JE

Boards and Plate Assy

7000-845-SE

Boards and Plate Assy

7001-214-SE

Analyzer Main Processor Board

8000-148-SE

Analyzer Main Processor Board

8000-119-SE

Aspirator Air Solenoid Valve

36090JE

Boards and Plate Assy

7000-845-SE

Boards and Plate Assy

7001-214-SE

Analyzer Main Processor Board

8000-148-SE

Analyzer Main Processor Board

8000-119-SE

Aspirator Air Solenoid Valve

36090JE

Boards and Plate Assy

7000-845-SE

Boards and Plate Assy

7001-214-SE

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Ametek

Explore Other Assets