Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Alfa Laval Gasketed Plate Heat Exchanger AQ6
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Heat Exchanger Pressure Testing
Pre-Test Preparation
Ensure pressure testing is performed by authorized personnel.
Is a qualified third-party contractor engaged if internal personnel are unavailable?
Hydrostatic Leakage Test
Perform hydrostatic leakage test after maintenance involving plates or gaskets.
Is one media side tested at a time with the other side open to ambient pressure?
For multi-pass units, are all sections of the same side tested simultaneously?
Test Duration and Pressure
Enter the test duration for each media side (in minutes).
Heat Exchanger Manual Cleaning
Pre-Opening Checks
Check warranty conditions before opening the heat exchanger.
Is the heat exchanger cooled down to about 40°C (104°F)?
Ensure proper protective equipment is worn
Bolt Configuration Identification
Identify bolt types
Opening Procedure
Shut down the heat exchanger.
Close the valves and isolate the heat exchanger from the system.
Heat Exchanger Maintenance
General Maintenance
Record all maintenance activities
Clean plates regularly depending on media type and temperature
Select cleaning method
Regasket the heat exchanger after long periods of use if required
Keep the carrying bar and guiding bar clean and greased
Keep tightening bolts clean and greased
Check that all tightening bolts are firmly tightened
Verify that dimension A is correct according to the PHE drawing
Heat Exchanger Chemical Cleaning
Safety Precautions
Ensure proper protective equipment is worn
Verify that cleaning agents are handled safely
CIP Equipment Preparation
Contact Alfa Laval sales representative for correct CIP equipment size
Is the CIP equipment ready for use?
Cleaning Process
Select cleaning liquids to be used
Follow the instructions of the CIP equipment
3 Monthly Stored Heat Exchanger Visual Check
Indoor Storage Conditions
Is the storage room temperature between 15 and 20°C (60–70°F)?
Is the humidity level up to 70%?
Ensure no ozone-producing equipment is present (e.g., electric motors, welding equipment).
Confirm no organic solvents or acids are stored in the room.
Avoid direct sunlight, intensive heat radiation, or ultraviolet exposure.
Outdoor Storage Inspection
Inspect stored heat exchanger every three months.
Restore packing to original condition after inspection.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX