

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

AirX Climate Solutions Air Conditioner AVHA20
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Cooling Cycle Check
Pre-Start Checks
Has the crankcase heater been energized for at least 24 hours?
Verify all electrical connections before applying power
Initial Start-Up
Is the compressor rotation correct for 3-phase power units?
Thermostat Settings
Set cooling set point temperature higher than ambient temperature
Set heating set point temperature lower than ambient temperature
Set thermostat system switch to AUTO position
Heating Cycle Check
Initial Setup
Verify unit type
Heating Cycle Activation
Set heating set point temperature higher than ambient temperature
Did the fan and electric heat cycle on immediately?
System Shutdown
Move the system switch to the OFF position
Did all functions stop?
Economizer-Equipped Models Check
6 Monthly Air Conditioner Maintenance
Air Filter Maintenance
Replace the air filter if visibly dirty
Is the air filter in place after replacement?
Evaporator Coil Maintenance
Turn off electrical power before cleaning the evaporator coil
Clean the evaporator coil by vacuuming or using a commercial evaporator cleaning spray
Ensure the unit is fully dried before restoring power
Condenser Coil Maintenance
Turn off electrical power before cleaning the condenser coil
Access the parts list for your equipment in MaintainX.
Air Filter, 25 X 16 X 2 In., Merv 8
80137
Return Air Grille Vpg-20R, 20 X 12 In., Aluminum
80677
CommStat Touch Hvac Controller, Solid State Lead/Lag W/Remote Access
K/10439
CommStat 4 Hvac Controller, Solid State Lead/Lag
S/07846
CommStat 3 Hvac Controller, Solid State Lead/Lag
S/04581
Air Filter, 25 X 16 X 2 In., Merv 8
80137
Return Air Grille Vpg-20R, 20 X 12 In., Aluminum
80677
CommStat Touch Hvac Controller, Solid State Lead/Lag W/Remote Access
K/10439
CommStat 4 Hvac Controller, Solid State Lead/Lag
S/07846
CommStat 3 Hvac Controller, Solid State Lead/Lag
S/04581
Air Filter, 25 X 16 X 2 In., Merv 8
80137
Return Air Grille Vpg-20R, 20 X 12 In., Aluminum
80677
CommStat Touch Hvac Controller, Solid State Lead/Lag W/Remote Access
K/10439
CommStat 4 Hvac Controller, Solid State Lead/Lag
S/07846
CommStat 3 Hvac Controller, Solid State Lead/Lag
S/04581
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













