MaintainX Asset Hub logo
EnterprisePricing
AERCO International

AERCO International Boiler Benchmark 2000

Need answers fast?
Explore the manual using AI.

AERCO International Boiler Benchmark 2000
AERCO International Boiler Benchmark 2000

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

AERCO International Boiler Benchmark 2000

AERCO International Boiler Benchmark 2000

Create an account to install this asset package.

Maintenance Plans for AERCO International Boiler Model Benchmark 2000

Integrate maintenance plans directly into your work orders in MaintainX.

12 Monthly Air Filter Maintenance

Check mark

Warning: This maintenance check requires trained personnel with PPE!

Check mark

Is the boiler operational?

Check mark

If boiler is not operational, report the issues to the maintenance team and stop the procedure

Check mark

Set the ON/OFF switch on the control panel, to the OFF position. Disconnect AC power from the unit.

Check mark

Remove the top shroud from the unit by grasping the top handle and lifting straight up. This will disengage the shroud from the four (4) pins in the side panels.

Check mark

Refer to Figure 7-7 and locate the air filter attached to the air/fuel valve inlet.

Check mark

Using a flat-tip screwdriver or 5/16” nut driver, loosen the clamp securing the filter to the inlet flange of the air/fuel valve. Remove the filter and clamp.

Check mark

The filter may be cleaned in hot soapy water to remove oil and dirt. The filter should be thoroughly dried and then sprayed with a light coating of oil, such as WD-40, prior to reinstallation.

Check mark

Each replacement air filter is equipped with its own clamp. Therefore, simply install the replacement air filter on inlet flange of the air fuel valve and tighten the clamp with a flattip screwdriver or 5/16” nut driver.

Run this procedureArrow right

12 Monthly Condensate Drain Trap Maintenance

Check mark

Warning: To avoid personal injury, ensure that the following guidelines are strictly observed before servicing:

Check mark

Disconnect the AC supply by turning off the service switch and AC supply circuit breaker.

Check mark

Shut off the gas supply at the manual shut-off valve provided with the unit.

Check mark

Allow the unit to cool to a safe water temperature to prevent burning or scalding.

Check mark

Did you disconnect the external condensate trap by loosening the union pipe connection between the trap and the exhaust manifold drain pipe?

Check mark

Did you remove the connections on the inlet and outlet sides of the condensate trap?

Check mark

Did you loosen the four thumbscrews securing the cover on the condensate trap and remove the cover?

Check mark

Did you remove the float from the condensate trap?

Check mark

Did you remove the O-ring and orifice gaskets from the trap?

Run this procedureArrow right

1 Daily Boiler Test

Check mark

WARNING: Periodic testing of all boiler controls and safety devices is required to determine that they are operating as designed. Precautions shall be taken while tests are being performed to protect against bodily injury and property damage. The owner or user of an automatic boiler system should set up a formal system of periodic preventive maintenance and testing. Tests should be conducted on a regular basis and the results recorded in a log-book.

Check mark

Gauges, monitors and indicators: Visual inspection and record readings in operator log

Check mark

Instrument and equipment settings: Visual check against factory recommended specifications

Check mark

Sign off on the daily boiler test

Run this procedureArrow right

1 Monthly Boiler Test

Check mark

WARNING: Periodic testing of all boiler controls and safety devices is required to determine that they are operating as designed. Precautions shall be taken while tests are being performed to protect against bodily injury and property damage. The owner or user of an automatic boiler system should set up a formal system of periodic preventive maintenance and testing. Tests should be conducted on a regular basis and the results recorded in a log-book.

Check mark

Flue, vent, stack or intake air duct: Visually inspection condition and check for obstructions

Check mark

Low air flow: See section 6.8

Check mark

1. Disable the blower output drive voltage as follows:

Check mark

(a) Press the MENU key until CONFIGURATION MENU is displayed.

Check mark

(b) Press the ▲ arrow key until the ANALOG OUTPUT function is displayed, then press the CHANGE key.

Check mark

(c) Press the ▼ arrow key until OFF is displayed, then press the ENTER key.

Check mark

2. Start the unit in the Manual Mode at a valve position between 25% and 30%.

Check mark

3. The unit should shut down and lockout, showing AIRFLOW FAULT DURING PURGE in the display.

Run this procedureArrow right

1 Weekly Boiler Test

Check mark

WARNING: Periodic testing of all boiler controls and safety devices is required to determine that they are operating as designed. Precautions shall be taken while tests are being performed to protect against bodily injury and property damage. The owner or user of an automatic boiler system should set up a formal system of periodic preventive maintenance and testing. Tests should be conducted on a regular basis and the results recorded in a log-book.

Check mark

Instrument and equipment settings: Verify factory settings

Check mark

Spark Igniter-Injector:

Check mark

1. Set the ON/OFF switch on the control panel, to the OFF position. Disconnect AC power from the unit

Check mark

2. Remove the top shroud from the unit by grasping the top handle and lifting straight up. This will disengage the shroud from the four (4) pins in the side panels.

Check mark

3. Disconnect the cable from the igniter-injector (Figure 7-1).

Check mark

4. Refer to the partial exploded view in Figure 7-2. Using a 7/16” open-end wrench, disconnect the compression nut securing the gas injector tube of the igniter-injector to the elbow of the staged ignition assembly. Disconnect the staged ignition assembly from the igniter-injector.

Check mark

5. Next, loosen and remove the igniter-injector from the burner plate using a 1" open-end wrench.

Check mark

6. Check the igniter-injector for evidence of erosion or carbon build-up. If there is evidence of substantial erosion or carbon build-up, the igniter-injector should be replaced. If carbon build-up is present, clean the component using fine emery cloth. Repeated carbon buildup is an indication that the combustion settings of the unit should be checked. Refer to Chapter 4 for combustion calibration procedures.

Run this procedureArrow right

Parts for AERCO International Boiler Benchmark 2000

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

100 Ps

58087-4

125 Psi

58087-7

12V Power Suply

65109

1/4" Bolt Size Flat Washer

123626

1/4" Npt Mxf Brass Ball Valve

92077

100 Ps

58087-4

125 Psi

58087-7

12V Power Suply

65109

1/4" Bolt Size Flat Washer

123626

1/4" Npt Mxf Brass Ball Valve

92077

100 Ps

58087-4

125 Psi

58087-7

12V Power Suply

65109

1/4" Bolt Size Flat Washer

123626

1/4" Npt Mxf Brass Ball Valve

92077

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from AERCO International

Explore Other Assets