Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
WEG WEG - CFW300 CFW300
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Hourly Replacement
Replace fan after 40.000 operating hours;
Monthly Inspection
Terminals, connectors: inspect for loose screws and connectors. TIghten if necessary.
Fans / Cooling systems: inspect for dirty fans, abnormal acoustic noise, blocked fan, abnormal vibration, dust in the cabinet air filter. Clean or replace as necessary.
Printed circuits boards: inspect for accumulation of dust, oil, humidity, odor, etc. Clean or replace as necessary.
Power module / Power connections: inspect for accumulation of dust, oil, humidity, loose connections screws. Clean or tighten as necessary.
DC Link capacitors: inspect for discoloration / odor / electrolyte leakage, expanded or broken safety valve, frame size expansion. Replace if necessary.
Power resistors: inspect for discoloration, odor. Replace if necessary.
Heatsink: inspect for accumulation of dust, dirt. Clean if necessary.
Yearly Power Up
Electrolytic capacitors:
If the inverter is stocked (not being used): “Reforming”
Every year from then manufacturing date printed on the inverter identification label (refer to Section 2.5 RECEIVING AND STORAGE on page 11).
Apply power to the inverter (voltage between 220 and 230 Vac, single-phase/three-phase or DC (according to the model of the inverter), 50 or 60 Hz) for at least one hour. Then, disconnect the power supply and wait at least 24 hours before using the inverter (reapply power);
Yearly Replacement
Electrolytic capacitors:
Inverter is being used: replace Every 10 years
Contact WEG technical support to obtain replacement procedures;
Access the parts list for your equipment in MaintainX.
RFI Filter Kit
13015615
RS-485 Communication Module
13015223
Profibus DP Communication Module
13015055
RS-232 Communication Module
13014674
Input And Output Expansion Module
13015051
RFI Filter Kit
13015615
RS-485 Communication Module
13015223
Profibus DP Communication Module
13015055
RS-232 Communication Module
13014674
Input And Output Expansion Module
13015051
RFI Filter Kit
13015615
RS-485 Communication Module
13015223
Profibus DP Communication Module
13015055
RS-232 Communication Module
13014674
Input And Output Expansion Module
13015051
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX