Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Trane CenTraVac™ Water-Cooled Chiller CVHG - 670-780 - 621 - 142L / 142L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Yearly Evaporator Maintenance
Clean Evaporator
Is the evaporator part of a closed circuit?
If the evaporator is part of a closed circuit, it may not accumulate appreciable amounts of scale or sludge.
Has the evaporator been cleaned in the last three years?
Normally, cleaning every three years is sufficient.
Is the evaporator part of an open system, such as air washers?
However, periodic inspection and cleaning is recommended on open evaporator systems, such as air washers.
Sign off on the evaporator maintenance
6 Monthly Chiller Maintenance
Operate the tang operators manually and check for any abnormalities
Drain contents of the rupture disk and purge discharge vent-line drip-leg into an evacuated waste container
Do this more often if the purge is operated excessively
Apply oil to any exposed metal parts to prevent rust
1 Yearly Oil System Inspection
- Shut down the chiller once each year to check the items of Oil System
1. Perform Annual oil analysis (follow recommendations)
2. Clean and lubricate oil system as required
3. Electrical inspection
4. Pump motor continuity check
5. Run oil pump and check differential oil pressure;
Initial 1000 Hours/6 Months Chiller Oil Replacement
NOTICE: Equipment Damage! Mixing refrigerants or oils could result in equipment damage including bearing damage, introduction of acids into the chiller, or continuous purge pump-out in high-head/high ambient applications.
CenTraVac chillers are manufactured with different refrigerant/oil systems: 1) chillers using R-123 refrigerant and OIL00022 compressor oil, and 2) chillers using R-514A refrigerant and OIL00334/OIL00335 compressor oil.
Verify proper refrigerant and oil for your chiller and do NOT mix refrigerants or oils!
Important: Verify proper refrigerant and compressor oil for your chiller before proceeding!
After the first six months of accumulated operation or after 1000 hours operation—whichever comes first—it is recommended to change the oil and filter.
After this oil change, it is recommended to subscribe to the Trane annual oil analysis program rather than automatically change the oil as part of scheduled maintenance.
Change the oil only if indicated by the oil analysis. Using an oil analysis program will reduce the chiller’s overall lifetime waste oil generation and minimize refrigerant emissions.
The analysis determines system moisture content, acid level, and wear metal content of the oil, and can be used as a diagnostic tool. The oil analysis should be performed by a qualified laboratory that is experienced in refrigerant and oil chemistry and in the servicing of Trane® centrifugal chillers.
In conjunction with other diagnostics performed by a qualified service technician, oil analyses can provide valuable information on the performance of the chiller to help minimize operating and maintenance costs and maximize its operating life.
1 Yearly Starter/Adaptive Frequency Drive Inspection
Shut down the chiller once each year to check the items of Starter or Adaptive FrequencyTM Drive
Inspect starter contacts
Check all connections per manufacturer specifications
Follow all manufacturer recommendations for starter or Adaptive FrequencyTM Drive (AFD) maintenance
Inspect/clean/service the AFD cooling system (water- or air-cooled AFD)
Record all applicable starter or starter component settings
Sign off on the yearly inspection
Access the parts list for your equipment in MaintainX.
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX