MaintainX Logo
EnterprisePricing
Trane

Trane CenTraVac™ Water-Cooled Chiller CVHG - 670-780 - 621 - 142L / 142L

Need answers fast?
Explore the manual using AI.

Trane CenTraVac™ Water-Cooled Chiller CVHG - 670-780 - 621 - 142L / 142L
Trane CenTraVac™ Water-Cooled Chiller CVHG - 670-780 - 621 - 142L / 142L

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane CenTraVac™ Water-Cooled Chiller CVHG - 670-780 - 621 - 142L / 142L

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHG - 670-780 - 621 - 142L / 142L

Trane CenTraVac™ Water-Cooled Chiller CVHG - 670-780 - 621 - 142L / 142L

Create an account to install this asset package.

Maintenance Plans for Trane CenTraVac™ Water-Cooled Chiller Model CVHG - 670-780 - 621 - 142L / 142L

Integrate maintenance plans directly into your work orders in MaintainX.

3 Yearly Evaporator Maintenance

Check mark

Clean Evaporator

Check mark

Is the evaporator part of a closed circuit?

Check mark

If the evaporator is part of a closed circuit, it may not accumulate appreciable amounts of scale or sludge.

Check mark

Has the evaporator been cleaned in the last three years?

Check mark

Normally, cleaning every three years is sufficient.

Check mark

Is the evaporator part of an open system, such as air washers?

Check mark

However, periodic inspection and cleaning is recommended on open evaporator systems, such as air washers.

Check mark

Sign off on the evaporator maintenance

Run this procedureArrow right

6 Monthly Chiller Maintenance

Check mark

Operate the tang operators manually and check for any abnormalities

Check mark

Drain contents of the rupture disk and purge discharge vent-line drip-leg into an evacuated waste container

Check mark

Do this more often if the purge is operated excessively

Check mark

Apply oil to any exposed metal parts to prevent rust

Run this procedureArrow right

1 Yearly Oil System Inspection

Check mark

- Shut down the chiller once each year to check the items of Oil System

Check mark

1. Perform Annual oil analysis (follow recommendations)

Check mark

2. Clean and lubricate oil system as required

Check mark

3. Electrical inspection

Check mark

4. Pump motor continuity check

Check mark

5. Run oil pump and check differential oil pressure;

Run this procedureArrow right

Initial 1000 Hours/6 Months Chiller Oil Replacement

Check mark

NOTICE: Equipment Damage! Mixing refrigerants or oils could result in equipment damage including bearing damage, introduction of acids into the chiller, or continuous purge pump-out in high-head/high ambient applications.

Check mark

CenTraVac chillers are manufactured with different refrigerant/oil systems: 1) chillers using R-123 refrigerant and OIL00022 compressor oil, and 2) chillers using R-514A refrigerant and OIL00334/OIL00335 compressor oil.

Check mark

Verify proper refrigerant and oil for your chiller and do NOT mix refrigerants or oils!

Check mark

Important: Verify proper refrigerant and compressor oil for your chiller before proceeding!

Check mark

After the first six months of accumulated operation or after 1000 hours operation—whichever comes first—it is recommended to change the oil and filter.

Check mark

After this oil change, it is recommended to subscribe to the Trane annual oil analysis program rather than automatically change the oil as part of scheduled maintenance.

Check mark

Change the oil only if indicated by the oil analysis. Using an oil analysis program will reduce the chiller’s overall lifetime waste oil generation and minimize refrigerant emissions.

Check mark

The analysis determines system moisture content, acid level, and wear metal content of the oil, and can be used as a diagnostic tool. The oil analysis should be performed by a qualified laboratory that is experienced in refrigerant and oil chemistry and in the servicing of Trane® centrifugal chillers.

Check mark

In conjunction with other diagnostics performed by a qualified service technician, oil analyses can provide valuable information on the performance of the chiller to help minimize operating and maintenance costs and maximize its operating life.

Run this procedureArrow right

1 Yearly Starter/Adaptive Frequency Drive Inspection

Check mark

Shut down the chiller once each year to check the items of Starter or Adaptive FrequencyTM Drive

Check mark

Inspect starter contacts

Check mark

Check all connections per manufacturer specifications

Check mark

Follow all manufacturer recommendations for starter or Adaptive FrequencyTM Drive (AFD) maintenance

Check mark

Inspect/clean/service the AFD cooling system (water- or air-cooled AFD)

Check mark

Record all applicable starter or starter component settings

Check mark

Sign off on the yearly inspection

Run this procedureArrow right

Parts for Trane CenTraVac™ Water-Cooled Chiller CVHG - 670-780 - 621 - 142L / 142L

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets