The Trane CenTraVac™ Water-Cooled Chiller CVHF model is a high-efficiency cooling solution designed for large industrial applications. Known for its reliability and performance, this chiller model offers advanced features to optimize energy use and maintain consistent temperature control. Ideal for various commercial settings, it ensures effective climate management.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 300-500 - 360 - 050S / 050L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Chiller Lubrication
Lubricate the gantries annually
Select the lubricant used for gantries
Gantries lubricated successfully?
Lubricate the hinges annually
Select the lubricant used for hinges
Hinges lubricated successfully?
Sign off on the chiller lubrication
1 Yearly Optional Accessories Maintenance
Shut down the chiller once each year to check the items of Optional Accessories
If applicable, lubricate factory-installed gantries
After the first month of operation, inspect Heresite® or Belzona® coated waterboxes; thereafter, inspect as needed
Inspect anodes
Inspect and lubricate hinged waterboxes
With water flow sensing option, bleed tubing from waterboxes to transformers
Sign off on the 1 Yearly Optional Accessories Maintenance
1 Yearly Evaporator Inspection
Shut down the chiller
Inspect for fouling and scaling in tubes
Check operation of evaporator water flow sensing device
Factory recommendation to eddy current test tubes every three years
Sign off on the evaporator inspection
1 Yearly Condenser Inspection
Shut down the chiller
Inspect for fouling and scaling in tubes
Check operation of condenser water flow sensing device
Factory recommendation to eddy current test tubes every three years
Sign off on the condenser inspection
1 Yearly Control Circuits Inspection
Shut down the chiller
Verify control parameters
Test appropriate sensors for accuracy
Ensure sensors are properly seated in wells with thermopaste installed
Check evaporator leaving water temperature low temperature cutout setpoint
Condenser high pressure switch check-out
Check adjustment and operation of the inlet guide vane actuator
Sign off on the control circuits inspection
Access the parts list for your equipment in MaintainX.
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













