Trane CenTraVac™ Water-Cooled Chiller CVHF - 1070-1300 - 1062 - 210L / 210L

Need answers fast?
Explore the manual using AI.

Trane CenTraVac™ Water-Cooled Chiller CVHF - 1070-1300 - 1062 - 210L / 210L
Trane CenTraVac™ Water-Cooled Chiller CVHF - 1070-1300 - 1062 - 210L / 210L

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane CenTraVac™ Water-Cooled Chiller CVHF - 1070-1300 - 1062 - 210L / 210L

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 1070-1300 - 1062 - 210L / 210L

Trane CenTraVac™ Water-Cooled Chiller CVHF - 1070-1300 - 1062 - 210L / 210L

Create an account to install this asset package.

Maintenance Plans for Trane CenTraVac™ Water-Cooled Chiller Model CVHF - 1070-1300 - 1062 - 210L / 210L

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Control Circuits Inspection

Check mark

- Shut down the chiller once each year to check the items of Control Circuits

Check mark

1. Verify control parameters

Check mark

2. Test appropriate sensors for accuracy

Check mark

3. Ensure sensors are properly seated in wells with thermopaste installed

Check mark

4. Check evaporator leaving water temperature low temperature cutout setpoint

Check mark

5. Condenser high pressure switch check-out

Check mark

6. Check adjustment and operation of the inlet guide vane actuator;

Run this procedureArrow right

1 Yearly Exterior Parts Maintenance

Check mark

- Shut down the chiller once each year to check the items of Exterior

Check mark

1. Inlet guide vane linkage

Check mark

2. Clean and touch-up painted surfaces as needed

Check mark

3. Repair deteriorated, torn, or missing insulation;

Run this procedureArrow right

1 Yearly Chiller Maintenance

Check mark

- For R-123 chillers, perform the annual maintenance procedures referred to in Operation and Maintenance Guide: EarthWise Purge System with Tracer AdaptiView Control for Water-Cooled CenTraVac Chillers with R-123 Refrigerant (PRGF- SVX01*-EN). For R-514A chillers, perform the annual maintenance procedures referred to in Operation and Maintenance Guide: Purge System with Tracer AdaptiView Control for Water-Cooled CenTraVac Chillers with R-514A Refrigerant (PRGG-SVX001*-EN)

Check mark

- Use an ice water bath to verify the accuracy of the evaporator refrigerant temperature sensor (4R10). If the sensor is exposed to temperature extremes outside its normal operating range (0°F to 90°F [-17.8°C to 32.2°C]), check its accuracy at six-month intervals

Check mark

- Inspect the condenser tubes for fouling; clean if necessary

Check mark

- Inspect and clean the ifm efector® flow detection sensors. Use Scotch-Brite® or other non-abrasive material to clean scale; do NOT use steel wool, which could cause the probe to rust

Check mark

- Submit a sample of the compressor oil to a Trane- qualified laboratory for comprehensive analysis

Check mark

- Measure the compressor motor winding resistance to ground; a qualified service technician should conduct this check to ensure that the findings are properly interpreted. Contact a qualified service organization to leak-test the chiller; this procedure is especially important if the system requires frequent purging;

Run this procedureArrow right

1 Yearly Starter/Adaptive Frequency Drive Inspection

Check mark

- Shut down the chiller once each year to check the items of Starter or Adaptive FrequencyTM Drive

Check mark

1. Inspect starter contacts

Check mark

2. Check all connections per manufacturer specifications

Check mark

3. Follow all manufacturer recommendations for starter or Adaptive FrequencyTM Drive (AFD) maintenance

Check mark

4. Inspect/clean/service the AFD cooling system (water- or air-cooled AFD)

Check mark

5. Record all applicable starter or starter component settings;

Run this procedureArrow right

1 Daily Chiller Maintenance

Check mark

- Check the chiller’s evaporator and condenser pressures, oil tank pressure, differential oil pressure, and discharge oil pressure

Check mark

- Compare the readings with the values provided in the general maintenance

Check mark

- Check the oil level in the chiller oil sump using the two sight glasses provided in the oil sump head. When the unit is operating, the oil level should be visible in the lower sight glass

Check mark

- Complete logs on a daily basis.

Run this procedureArrow right

Parts for Trane CenTraVac™ Water-Cooled Chiller CVHF - 1070-1300 - 1062 - 210L / 210L

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Evap Lifting Fixture, CTV Unit

BAR00400

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.