Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Thermo Scientific Variable Wavelength Detectors VF-D40
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Flow Cell Cleaning
Preparation
Ensure all parts are available
Wear personal protective equipment
Flow Cell Cleaning Procedure
Flush the flow cell with HPLC-grade water
Fill the flow cell with 0.1 M nitric acid using the optional flushing and injection kit
Flush the flow cell with HPLC-grade water until the solvent leaving the flow cell is neutral (pH 7)
Did cleaning the flow cell eliminate the problem?
Install a new flow cell if the problem persists
Variable Wavelength Detector Cleaning
Safety Precautions
Ensure all personnel are wearing suitable personal protective equipment.
Ensure cleaning is performed in an adequately ventilated room.
Avoid open flames or exposure to excessive heat during cleaning.
Preparation
Turn off the power to the device.
Disconnect the power cord from the power source.
Cleaning Procedure
Wipe the surfaces clean with a clean, dry, soft, lint-free cloth or wipe.
Doors Replacement
Preparations
Remove all reservoirs from the solvent rack if the door is located directly below it.
Is the display installed next to the door to be replaced?
Loosen the fastening block of the display to push it toward the system rear, if necessary.
Door Removal and Installation
Lift the solvent rack slightly on the front edge if the door is located directly below it.
Push the door upward while opening to remove it.
Open the door to align the two hinges on the housing with the grooves on the door.
Tilt the door slightly to the outside and remove it.
Lamp Replacement
Parts Required
Ensure all parts are available
Preparations
Turn off the UV lamp
Turn off the device with its main power switch
Lamp Removal
Open the doors
Loosen the screws on the lamp house cover
Remove the lamp house cover
Slide-In Module Replacement
Removing the Slide-In Module
Ensure team effort for handling the device
Prepare the device for transport
Loosen the four captive screws on the front left and front right of the device
Push all tubing and capillaries into the tubing chase
Grasp the slide-in module by the leak tray or by the lamp house cover and the partition panel
Pull the module out of the enclosure by approximately 10 cm
Remove the slide-in module from the enclosure with team effort
Returning the Slide-In Module
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













