MaintainX Asset Hub logo
EnterprisePricing
SEW eurodrive

SEW eurodrive Electric Motor DT90S4

Need answers fast?
Explore the manual using AI.

SEW eurodrive Electric Motor DT90S4
SEW eurodrive Electric Motor DT90S4

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for SEW eurodrive Electric Motor DT90S4

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

SEW eurodrive Electric Motor DT90S4

SEW eurodrive Electric Motor DT90S4

Create an account to install this asset package.

Maintenance Plans for SEW eurodrive Electric Motor Model DT90S4

Integrate maintenance plans directly into your work orders in MaintainX.

Initial Startup Check

Check mark

6.1 Prerequisites for startup

Check mark

Before startup, ensure the following conditions are met

Check mark

During startup, ensure the following conditions are met

Run this procedureArrow right

Anticorrosion Coating Maintenance

Check mark

Inspection and maintenance intervals

Check mark

Determine the maintenance interval for the drive based on external factors

Check mark

Touch up or renew the surface/anticorrosion coating

Run this procedureArrow right

2 Yearly Brake Inspection

Check mark

8.1 Inspection and maintenance intervals

Check mark

Use only genuine spare parts in accordance with the valid parts list

Check mark

Install a new brake control system when replacing the brake coil

Check mark

Ensure motors are not hot to avoid danger of burns

Check mark

Secure hoist drives or lower them to prevent danger of falling

Check mark

Isolate the motor and brake from the supply to prevent unintentional power-up

Check mark

Inspect brake types if used as a holding brake

Check mark

Document inspection/maintenance intervals based on project planning documents

Check mark

Inspection Procedure

Run this procedureArrow right

Brake Maintenance

Check mark

Inspection / maintenance of the BMG61/122 brake

Check mark

Ensure the following conditions are met before maintenance

Check mark

BMG61/122 brake without encoder mounting — set the working air gap

Check mark

Isolate the motor and brake from the supply, safeguarding them against unintentional power-up

Check mark

Remove the forced cooling fan, if installed, and the flange cover or fan guard [27]

Check mark

Push the rubber sealing collar aside [5], releasing the clamping strap to do this if necessary, and extract the abraded matter

Check mark

Measure the brake discs [6], [10] and check if the brake disc is < 12 mm

Check mark

Is the brake disc < 12 mm?

Check mark

Change the brake disc if it is < 12 mm

Run this procedureArrow right

10000 Hourly Motor Maintenance

Check mark

8.1 Inspection and maintenance intervals

Check mark

Isolate the motor and brake from the supply before starting work, safeguarding them against unintentional power-up

Check mark

Inspect the motor

Check mark

8.3 Inspection / maintenance on the motor

Check mark

Remove the forced cooling fan and encoder, if installed

Check mark

Remove flange or fan guard and fan

Check mark

Remove the hex head bolt from the drive end bearing end shield and the non-drive end bearing end shield, release the stator from the drive end bearing end shield

Check mark

For motors with BM/BMG brake: open the terminal box cover, unfasten the brake cable from the rectifier; push the non-drive end bearing end shield and the brake off the stator and carefully lift them off

Check mark

For motors with BMG02, BR03 brake: remove the complete brake with the releasing lever

Run this procedureArrow right

Parts for SEW eurodrive Electric Motor DT90S4

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Carrier Plate For Installation Integrated In The Motor According To The ECOFAST Specification; Obtain From SEW-EURODRIVE

0187 390 3

BMG02 Brake 24 VDC 0.8 Nm

0574 319 2

BMG02 Brake 24 VDC 1.2 Nm

0574 323 0

BMG02/HR Brake 24 VDC 0.8 Nm

0574 327 3

BMG02/HR Brake 24 VDC 1.2 Nm

0574 331 1

Carrier Plate For Installation Integrated In The Motor According To The ECOFAST Specification; Obtain From SEW-EURODRIVE

0187 390 3

BMG02 Brake 24 VDC 0.8 Nm

0574 319 2

BMG02 Brake 24 VDC 1.2 Nm

0574 323 0

BMG02/HR Brake 24 VDC 0.8 Nm

0574 327 3

BMG02/HR Brake 24 VDC 1.2 Nm

0574 331 1

Carrier Plate For Installation Integrated In The Motor According To The ECOFAST Specification; Obtain From SEW-EURODRIVE

0187 390 3

BMG02 Brake 24 VDC 0.8 Nm

0574 319 2

BMG02 Brake 24 VDC 1.2 Nm

0574 323 0

BMG02/HR Brake 24 VDC 0.8 Nm

0574 327 3

BMG02/HR Brake 24 VDC 1.2 Nm

0574 331 1

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from SEW eurodrive

Explore Other Assets