

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Prominent Solenoid Metering Pump Gamma/ XL 0730
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Diaphragm Replacement
Preparation
Enter the order number of the diaphragm or spare parts kit
Have protective measures been taken, if necessary?
Is the material safety data sheet for the feed chemical noted?
Is the escape of feed chemical prevented?
Is the system at atmospheric pressure?
Liquid End Emptying
Turn the liquid end upside down and allow the feed chemical to run out
Flush out with a suitable medium
Diaphragm Rupture Indicator Cleaning
Preparation
Replace the liquid end diaphragm
Cleaning Process
Unscrew the diaphragm rupture indicator using an AF 14 open-ended spanner
Clean the diaphragm rupture indicator with suitable liquid, preferably water
Testing
Fully immerse the tapered section of the diaphragm rupture indicator in water
Does the continuous display indicate a diaphragm rupture?
Post-Cleaning
3 Monthly Solenoid Metering Pump Check
Safety Precautions
Read the safety information and specifications in the 'Storage, Transport and Unpacking' chapter prior to shipping the pump.
Ensure the pump is disconnected from the mains power supply and cannot be switched on by unauthorized persons.
Ensure the system is at atmospheric pressure before working on hydraulic parts.
Use of Spare Parts
Only use original spare parts.
Use the correct spare parts kits. Refer to exploded views and ordering information if in doubt.
Hydraulic System Checks
Check that the hydraulic lines are fixed firmly to the liquid end.
1 Yearly Diaphragm Damage Check
Safety Information Acknowledgment
Disconnect the pump from the mains power supply
Ensure the system is at atmospheric pressure
Use only original spare parts
Check the diaphragm for damage
Check the metering diaphragm more frequently if using abrasive chemicals
Use a diaphragm rupture indicator if necessary
Vptfe Diaphragm Replacement
Preparation
Ensure all spare parts are available
Diaphragm Replacement
Loosen the dosing head screws
Remove the old vPTFE diaphragm
Install the new vPTFE diaphragm
Valve and Connector Installation
Install the suction valve
Install the discharge valve
Access the parts list for your equipment in MaintainX.
Varistor
710912
RC Gate 0.22 ΜF/220 Ω
710802
2.0 Diaphragm Complete
1117352
2.0 Spare Parts Kit Pvm
1118459
2.0 Spare Parts Kit Pvn
1118464
Varistor
710912
RC Gate 0.22 ΜF/220 Ω
710802
2.0 Diaphragm Complete
1117352
2.0 Spare Parts Kit Pvm
1118459
2.0 Spare Parts Kit Pvn
1118464
Varistor
710912
RC Gate 0.22 ΜF/220 Ω
710802
2.0 Diaphragm Complete
1117352
2.0 Spare Parts Kit Pvm
1118459
2.0 Spare Parts Kit Pvn
1118464
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













