MaintainX Asset Hub logo
EnterprisePricing
Nidec

Nidec Automatic Chart Projector CP-690

Need answers fast?
Explore the manual using AI.

Nidec Automatic Chart Projector CP-690
Nidec Automatic Chart Projector CP-690

The Nidec Automatic Chart Projector CP-690 is a high-performance projection device designed for precision imaging in various industrial applications. Known for its reliability and advanced optical technology, this model ensures clear and accurate presentations, making it an essential tool for professionals in the field.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Nidec Automatic Chart Projector CP-690

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Nidec Automatic Chart Projector CP-690

Nidec Automatic Chart Projector CP-690

Create an account to install this asset package.

Maintenance Plans for Nidec Automatic Chart Projector Model CP-690

Integrate maintenance plans directly into your work orders in MaintainX.

Adjustment of Intitialized Position

Check mark

Warning: This procedure requires technical knowledge and should be performed by trained personnel only.

Check mark

Top cover ASSY removed

Check mark

No. 8 of the DIP switch on the BA01 board turned to the ON position

Check mark

Ensure the main body is installed on a stable and level surface.

Check mark

Chart projected on the screen and focus roughly adjusted

Check mark

Operate the remote control as follows so that the first projected chart and open mask become horizontal.

Check mark

VA UP button pressed to move the chart up

Check mark

VA DOWN button pressed to move the chart down

Check mark

START button pressed to move the mask up

Run this procedureArrow right

Adjustment of the Chart and Mask Positions

Check mark

Remove the top and bottom cover ASSYs and disk cover (M030)

Check mark

Turn the power switch ON, project the chart onto the screen and adjust the focus

Check mark

Loosen SB4 × 10 (n=4) , SW4 (n=4) and PW4 (n=4) fixing the mask motor

Check mark

Make fine adjustments of the mask motor position to satisfy the conditions

Check mark

If the adjustment can not be completed by moving the mask motor, move the chart position by making fine adjustments of the chart sensor position

Check mark

When the chart sensor is moved, perform Adjustment of the fixed mask position

Check mark

Single letter mask position: When applying the single letter mask to the charts, the alphabetical letter shall be in about the center of the mask

Check mark

R/G filter position: The boundary between the red and green filters shall be in the middle of the chart horizontally

Check mark

Blocking of the astigmatism clock dial chart: The projected astigmatism clock dial chart shall be not blocked

Run this procedureArrow right

Adjustment of the Fixed Mask Position

Check mark

NOTE! The parts around the lamp become hot. Do not touch the parts directly by hand.

Check mark

Turn the power switch ON, project the chart on the screen and adjust the focus.

Check mark

Turn the power switch OFF, remove the top cover ASSY and disk cover (M030).

Check mark

Disconnect the connectors from J3 and J5 on the BA01 board.

Check mark

Unscrew BS3 × 6ZnC to remove the VA mask (M029).

Check mark

Turn the power switch ON again, rotate the chart and mask disks by hand to check the position (tilt) of the fixed mask.

Check mark

Loosen HH3 × 4 (n=2) to rotate the fixed mask by hand. Adjust it to satisfy the following conditions.

Check mark

Tighten the loosened screws while pushing the fixed mask into the lamp side.

Check mark

Assemble the removed parts in reverse order.

Run this procedureArrow right

Adjustment of the Lamp (LED) Position

Check mark

NOTE! For variable power lens barrel, set the lens position as below before adjustment.

Check mark

Remove the top and bottom cover ASSYs and turn the power switch ON.

Check mark

Place a piece of white paper at a position of 0 to 10 mm from the lower side of the front cover.

Check mark

The LED image appear on the paper as follows.

Check mark

Loosen TH screw (n=3) fixing LED ASSY. Adjust the focus of the LED image by pushing and pulling the LED ASSY. Fix TH screw where the reflection image is focused.

Check mark

Loosen PC screw (n=4) fixing LED ASSY. Move the LED ASSY in order that LED image becomes center of circle. Fix the screw where the reflection image of LED becomes center.

Check mark

Project the chart onto the screen to check that the chart brightness is even.

Check mark

Remount the top and bottom cover ASSYs.

Check mark

Sign off on the lamp adjustment

Run this procedureArrow right

Adjustment of the Sensor Voltage

Check mark

Top cover ASSY removed

Check mark

No. 8 of the DIP switch on the BA01 board turned to the ON position

Check mark

Warning: When turning the DIP switch to the ON or OFF position, slide the switch without loading the circuit board. If not, a failure may occur.

Check mark

Voltage between TP1 and TP3 on the BA01 board for chart sensor

Check mark

Voltage between TP1 and TP3 within the applicable range (4.5 V to 5.0 V)

Check mark

VA DOWN button on the remote control pressed twice and the VA UP button once

Check mark

Voltage between TP1 and TP3 on the BA01 board for chart sensor after pressing buttons

Check mark

Voltage between TP1 and TP3 within the applicable range (0.5 V or less)

Check mark

VA UP button on the remote control pressed once

Run this procedureArrow right

Parts for Nidec Automatic Chart Projector CP-690

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

1 Chip CPU

33159-E100

1 Chip CPU

33158-E100

1 Chip CPU

33160-E100

1 Chip CPU

33156-E200

1 Chip CPU

33161-E100

1 Chip CPU

33159-E100

1 Chip CPU

33158-E100

1 Chip CPU

33160-E100

1 Chip CPU

33156-E200

1 Chip CPU

33161-E100

1 Chip CPU

33159-E100

1 Chip CPU

33158-E100

1 Chip CPU

33160-E100

1 Chip CPU

33156-E200

1 Chip CPU

33161-E100

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Nidec

Explore Other Assets