Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Mitsubishi Outdoor Unit Split-Type Air Conditioner MUZ-AP71VG
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Cabinet Removal
Remove the screws of the service panel
Remove the screws of the top panel
Remove the screw of the valve cover
Remove the service panel
Remove the top panel
Remove the valve cover
Disconnect the power supply and indoor/outdoor connecting wire
Remove the screws of the cabinet
Remove the cabinet
Compressor / 4-Way Valve Removal
(1) Remove the top panel, cabinet and service panel. (Refer to section 1.)
(2) Remove the back panel. (Refer to section 1.)
(3) Remove the screws fixing the relay panel.
(4) Remove the relay panel.
(5) Remove the inverter assembly. (Refer to section 2.)
(6) Recover gas from the refrigerant circuit.
NOTE: Recover gas from the pipes until the pressure gauge shows 0 kg/cm2 (0 MPa).
(7) Detach the brazed part of the suction and the discharge pipe connected with compressor.
(8) Remove the compressor nuts.
Compressor Operation Time Check
Connect the compressor and activate the inverter
Compressor connected and inverter activated
Start heating or cooling operation by pressing EMERGENCY OPERATION switch on the indoor unit
Heating or cooling operation started
Time from the start of compressor to the stop of compressor due to overcurrent
Sign off on the compressor operation time check
Compressor Winding Check
Warning: Disconnect the connector between the compressor and the power module (IC700) before proceeding
Ohmmeter zeroed before measurement
Resistance measurement between BLK-WHT
Resistance measurement between BLK-RED
Resistance measurement between WHT-RED
Judgement
Sign off on the compressor winding check
Inverter Assembly Removal
Section 1: Cabinet and Service Panel Removal
Cabinet removed
Service panel removed
Section 2: Disconnecting Lead Wire and Connectors
Lead wire to the reactor disconnected
Disconnect the following connectors
Compressor connector removed
Earth wires and the lead wires of the inverter P.C. board removed
Section 3: Removing P.B. Support and Inverter P.C. Board
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













