Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Mitsubishi Indoor Unit TPKFYP004LM140A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Indoor Unit Adress/Controller/Wireless/Led Board Replacement
Remove the panel and the corner box
Remove the front and side electrical box covers (each 2 screw)
Disconnect the connectors of address board
Disconnect the connectors on the indoor controller board
Remove the switch board holder and open the cover
Pull out the indoor controller board toward you then remove the indoor controller board and switch board
Remove the holder of wireless remote controller board and LED board
Disconnect the connector of wireless remote controller board and LED board
Remove the wireless remote controller board and LED board from the holder
Indoor Unit Electrical Box Replacement
Remove the panel and the corner box
Remove the front and side electrical box covers
Disconnect the connectors
Disconnect the connectors
Disconnect the connector for ground wire
Remove the screw on lower side of the electrical box
Push up the upper fixture catch to remove the box, then remove it from the box fixture
Sign off on the electrical box replacement
Indoor Unit Fan Motor And Line Flow Fan Replacement
Remove the panel and the corner box
Remove the electrical box
Remove the nozzle assembly
Remove the water cover
Loosen the screw fixing the line flow fan
Remove 3 screws fixing the motor bed
Remove the motor bed together with fan motor and motor band
Release the 2 hooks of the motor band. Remove the motor band. Pull out the indoor fan motor
Remove 2 screws fixing the left side of the heat exchanger
Indoor Unit Heat Exchanger And LEV Replacement
Warning: This procedure requires trained personnel with PPE!
Panel and corner box removed
Electrical box and nozzle assembly removed
Water cover removed
Pipe thermistors removed
Connector (CN60) on the indoor controller board disconnected
Motor bed together with fan motor and motor band removed
2 screws fixing the left side of the heat exchanger removed
Heat exchanger with LEV removed
Indoor Unit Liquid And Gas Pipe Thermistor Replacement
Remove the panel and the corner box
Remove the electrical box covers
Remove the water cover
Remove the liquid pipe thermistor and gas pipe thermistors
Disconnect the connector (CN44) on the indoor controller board (TH22 and TH23/CN44)
Sign off on the thermistor replacement
Access the parts list for your equipment in MaintainX.
Drain Pump Kit
PAC-SK01DM-E
Drain Pump Kit
PAC-SK01DM-E
Drain Pump Kit
PAC-SK01DM-E
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX