Manual for Mitsubishi Ceiling-Concealed Indoor Unit SEZ-KD25VA

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Mitsubishi Ceiling-Concealed Indoor Unit SEZ-KD25VA

Mitsubishi Ceiling-Concealed Indoor Unit SEZ-KD25VA

Create an account to install this asset package.

Maintenance Plans for Mitsubishi Ceiling-Concealed Indoor Unit Model SEZ-KD25VA

Integrate maintenance plans directly into your work orders in MaintainX.

Gas Charging

Check mark

Maintenance

Check mark

Gas charge

Check mark

Connect gas cylinder to the service port of stop valve (3-way)

Check mark

Execute air purge of the pipe (or hose) coming from refrigerant gas cylinder

Check mark

Replenish specified amount of refrigerant, while running the air conditioner for cooling

Check mark

Note: In case of adding refrigerant, comply with the quantity specified for the refrigerating cycle

Check mark

Caution: Do not discharge the refrigerant into the atmosphere. Take care not to discharge refrigerant into the atmosphere during installation, reinstallation, or repairs to the refrigerant circuit

Check mark

For additional charging, charge the refrigerant from liquid phase of the gas cylinder

Check mark

If the refrigerant is charged from the gas phase, composition change may occur in the refrigerant inside the cylinder and the outdoor unit. In this case, ability of the refrigerating cycle decreases or normal operation can be impossible. However, charging the liquid refrigerant all at once may cause the compressor to be locked.Thus, charge the refrigerant slowly

Run this procedureArrow right

Air Conditioner Test

Check mark

Before test run

Check mark

Check that the unit is free from leaks of refrigerant, loosened connections, and incorrect polarity.

Check mark

Measure an impedance between the power supply terminal block (L, N, ) on the units and the ground with a 500 V Megger

Check mark

Test run

Check mark

For wireless remote controller

Check mark

Measure an impedance between the power supply terminal block on the outdoor unit and the ground with a 500 V Megger

Check mark

Check for any wrong wiring

Check mark

Press the snowflake icon button for more than 3 seconds to start the cooling operation. Check that the vanes operate properly when cool air is blown out.

Check mark

Press the sun icon button for more than 3 seconds to start the heating operation. Check that warm air blows out.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Mitsubishi

Explore Other Assets