MaintainX Asset Hub logo
EnterprisePricing
Mirion Technologies

Mirion Technologies Area Monitor Probe AMP-100

Need answers fast?
Explore the manual using AI.

Mirion Technologies Area Monitor Probe AMP-100
Mirion Technologies Area Monitor Probe AMP-100

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Mirion Technologies Area Monitor Probe AMP-100

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Mirion Technologies Area Monitor Probe AMP-100

Mirion Technologies Area Monitor Probe AMP-100

Create an account to install this asset package.

Maintenance Plans for Mirion Technologies Area Monitor Probe Model AMP-100

Integrate maintenance plans directly into your work orders in MaintainX.

CPU Unit Pulser Check

Check mark

Preparation

Check mark

Disconnect the detector D-type connector from the meter.

Check mark

Adjust the output pulser to obtain a five Volts amplitude and 10 μsec width pulse.

Check mark

Connect the output pulser

Check mark

Meter and Pulser Operation

Check mark

Turn the meter on.

Check mark

Turn the pulser on.

Check mark

Reading Verification

Check mark

Enter the meter reading.

Run this procedureArrow right

Area Monitor Probe Calibration

Check mark

Preparation

Check mark

Open the AMP-100 battery compartment cover

Check mark

Turn the internal dip switch 4 to the ON (calibration) position

Check mark

Display Calibration Factors

Check mark

Press the SPEAKER and RESET push-buttons simultaneously to display current calibration factors

Check mark

Calibration Factor Adjustment

Check mark

F1 Calibration

Check mark

Expose the detector to a radiation field of 10 R/h ± 2 R/h

Check mark

Press the RESET + SPEAKER push-buttons simultaneously

Run this procedureArrow right

Battery Replacement

Check mark

Battery Compartment Access

Check mark

Locate the battery compartment at the instrument back

Check mark

Slide out the battery compartment cover carefully

Check mark

Battery Replacement

Check mark

Remove the old 9-volt alkaline battery

Check mark

Insert a new 9-volt alkaline battery

Check mark

Ensure the battery is connected with the correct polarity

Check mark

External Power Supply Check

Check mark

Is the external DC input connected?

Run this procedureArrow right

EPROM Replacement

Check mark

Disconnection and Disassembly

Check mark

Disconnect the detector cable from the meter

Check mark

Disconnect the communication cable from the meter

Check mark

Loosen both capture screws on the battery compartment cover, take out the battery

Check mark

Loosen the four screws on the rear panel, turn and separate the meter’s parts

Check mark

Disconnect the touch panel flat cable (5-pin)

Check mark

Loosen the two PC #1938 board adjusting screws (located above the flat-cable connector)

Check mark

EPROM Replacement

Check mark

Remove the EPROM

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Mirion Technologies

Explore Other Assets