

The Lincoln Electric Fume Extraction System Prism 4 is a high-performance industrial solution designed to efficiently remove harmful fumes and particulates from the workplace. This advanced system ensures a safer environment by maintaining optimal air quality, making it essential for various manufacturing applications.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Lincoln Electric Fume Extraction System Prism 4
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Cleaning
Clean inside using an industrial vacuum cleaner.
Annual Maintenance
• Inspect unit for proper operation and function, address any issues found. • Fan motor temperature is within normal ranges, a hand held IR temp meter is a good tool for this. High motor temps indicate bearing or winding issues and predict a failure. This can also apply to the electrical power connections to the unit- elevated temps on junction boxes and wire terminations are precursors to problems.
Unit Housing Maintenance
• Clean housing with a non-aggressive detergent. • Check the connections to the duct work, seal if necessary. • Inspect and clean (with a non-aggressive detergent) the lter control box.
1 Monthly Check
• Check particulate collection drum and dispose of particulate if necessary. • Check and log lter pressure. • Check incoming pressure
6 Monthly Maintenance
• Ensure that the Cubic Feet per Minute (CFM) is operating to the engineered specications based on the individual system *
Access the parts list for your equipment in MaintainX.
Cable Assembly
-
Robotic Start/Stop Simulator
-
Motor Cable Formed
-
Smart Wire
-
Cable Assembly Single End
-
Cable Assembly
-
Robotic Start/Stop Simulator
-
Motor Cable Formed
-
Smart Wire
-
Cable Assembly Single End
-
Cable Assembly
-
Robotic Start/Stop Simulator
-
Motor Cable Formed
-
Smart Wire
-
Cable Assembly Single End
-
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













