MaintainX Asset Hub logo
EnterprisePricing
Limitorque

Limitorque Multi-Turn Actuator L120-10

Need answers fast?
Explore the manual using AI.

Limitorque Multi-Turn Actuator L120-10
Limitorque Multi-Turn Actuator L120-10

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Limitorque Multi-Turn Actuator L120-10

Limitorque Multi-Turn Actuator L120-10

Create an account to install this asset package.

Maintenance Plans for Limitorque Multi-Turn Actuator Model L120-10

Integrate maintenance plans directly into your work orders in MaintainX.

Torque Switch Balancing Adjustment

Check mark

Preparation

Check mark

Ensure that the unit is in manual mode and load is removed from the wormshaft spring pack

Check mark

Torque Switch Reinstallation

Check mark

Note the open and close torque switch settings prior to reinstalling the torque switch

Check mark

Loosen screws (A) and position both pointers (B) at the #1 setting, then tighten screw (A)

Check mark

Ensure index marks are aligned

Check mark

Loosen balancing screws and install the torque switch

Check mark

Ensure the base of the torque switch is flush against the compartment and the hole for the mounting screw is aligned

Check mark

Install the mounting screw

Run this procedureArrow right

18 Monthly Main Gear Case Lubricant Inspection

Check mark

Pre-Inspection Guidelines

Check mark

Ensure the actuator has been stored properly if not in use

Check mark

Has the actuator been stored for a long period?

Check mark

Lubricant Inspection

Check mark

Inspect the gear case for proper lubrication

Check mark

Is there any weeping around shaft seals?

Check mark

Remove any weeping with a clean rag if found

Check mark

Is the gear case mounted in a position that could cause vulnerable areas to be saturated with lubricant?

Check mark

Post-Inspection Actions

Run this procedureArrow right

Torque Switch Setting Adjustment

Check mark

Preparation

Check mark

Place the L120 unit in manual mode

Check mark

Release the load on the worm shaft spring pack

Check mark

Ensure the operator is not in a loaded condition before proceeding

Check mark

Torque Switch Setting Adjustment

Check mark

Adjust the torque switch setting for both open and close directions

Check mark

Set the pointer to the desired position

Check mark

Tighten screw (A)

Check mark

Post Adjustment Verification

Run this procedureArrow right

Limit Switch Setting Adjustment

Check mark

Initial Setup

Check mark

Open compartment cover (#200)

Check mark

Put the actuator into manual operation and use the handwheel to operate the valve in the 'open' direction

Check mark

Note the direction of the intermediate shaft (B) corresponding to the rotor or rotors to be set

Check mark

Valve Positioning

Check mark

When the valve is fully open, close it one turn of the handwheel to allow for coast of moving parts

Check mark

Gear Limit Switch Check

Check mark

Check the contacts of gear limit switch

Check mark

Refer to contact development wiring diagram and see the contact required at trip position/end position (NO/NC)

Run this procedureArrow right

Stem Nut Replacement

Check mark

STEM NUT REPLACEMENT

Check mark

Preparation

Check mark

Is the valve out of service and no possibility of pressure entering the line?

Check mark

Disconnect all incoming power to the unit

Check mark

Disassembly

Check mark

Remove actuator from valve

Check mark

Remove seal retainer (#102)

Check mark

Remove stem nut bearings and seals

Check mark

Inspection and Fitment

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Limitorque

Explore Other Assets