Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Keeprite Refrigiration Air Condenser KVS035H8
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6 Monthly Air Condenser Maintenance
Pre-maintenance Safety
Disconnect and lock off the main power supply to avoid accidental start-up
Electrical System Inspection
Check electrical components and tighten any loose connections
Check all wiring and electrical insulators
Check contactors for proper operation and contact point wear
Fan and Motor Inspection
Are fan motors operational?
Ensure fan blades are tight
Air Condenser Dehydration
Preparation
Use larger size hoses or copper lines
Perform oil change on vacuum pump at the beginning of each evacuation
Check vacuum pump, manifold, and hose assembly for pulling below 250 microns
Evacuation Setup
Evacuate system from access points
Ensure all solenoids in the system are open (energized) during evacuation
Ensure all ball valves in the system are open and all service valves are appropriately cracked or back-seated during evacuation
Deep Vacuum Method
Air Condenser Leak Testing
IMPORTANT: Leak Testing Overview
Confirm all system piping, including the evaporator and accessories, are ready for leak testing.
Pressurize the system with dry nitrogen to a maximum of 150 psig (1136 kPa).
Is the system free of major leaks after initial pressurization?
Detailed Leak Check for A1 Refrigerants
Discharge the initial dry nitrogen charge.
Add refrigerant to raise the system pressure up to 10 psig (170 kPa).
Add dry nitrogen to increase the system pressure to a maximum of 150 psig (1136 kPa).
Use an electronic leak detector to check for leaks.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.