

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Ingersoll Rand Oil/Water Separator PSG-90
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Pre-Adsorber And Adsorption Module Replacement
Preparation
Prepare the replacement Adsorption Module and Pre-Adsorber for service
Remove Adsorption Module and Pre-Adsorber from their plastic bags
Cleaning
Thoroughly hose down the Pre-Adsorber & Adsorption Module while rolling them until the water runs clear
Module Removal
Shut off the condensate flow to the Inlet Diffuser Assembly
Remove the Access Lid
Use a polypropylene pad to adsorb and remove any oil floating on the surface water in the Adsorption Module Chamber
1 Yearly Diffuser And Separation Filter Maintenance
Preparation
Shut off condensate flow to Inlet Diffuser Assembly
Disassembly
Unscrew the four Socket Head Cap Screws that hold the Diffuser to the Vessel
Lift up the Diffuser and move it out of the way
Remove the Sediment Chamber by grasping the edges and lifting slowly
Cleaning and Replacement
Tip the Sediment Chamber to pour contents through the Separation Filter and back into the vessel
Remove and discard the Separation Filter from the Sediment Chamber
2 Weekly Condensate Sample Turbidity Check
Sample Collection
Collect a sample from the Sample Valve using the empty Sample Jar
Hold both the Sample Jar and the Reference Jar to a light for a visual turbidity comparison
Stock Management
Ensure a spare Pre-Adsorber and Adsorption Module are in stock
Module Replacement
Is the Condensate Sample cloudy?
Change the Pre-Adsorber and Adsorption Module if the sample is cloudy
Post-Check Procedures
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













