Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Carrier HVAC Unit 30GT150
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Cooler Replacement
Preparation
Open and tag all electrical disconnects before any work begins.
Ensure cooler is not under pressure before removal.
Cooler Removal
Open circuit breakers and close discharge valves for lag compressors
Ensure discharge valve of operating compressor is not closed.
Monitor pressure until it reaches approximately 10 to 15 psig (68.8 to 103.2 kPa).
Shut down lead compressor by opening the compressor circuit breaker.
Close the discharge service valve for the lead compressor.
Cooler Head Gasket Replacement And Bolt Tightening
Gasket Preparation
Use new gaskets for reassembly
Brush gaskets with a light film of compressor oil
Ensure gaskets are not soaked to prevent deterioration
Use new gaskets within 30 minutes to prevent deterioration
Reassembly of Cooler Heads
Reassemble cooler nozzle end or plain end cover with gaskets
Bolt Tightening Procedure
Torque 5/8-in. Diameter Perimeter Bolts to 150 to 170 ft-lb (201 to 228 N-m)
Condenser Coil Cleaning
Coil Cleaning Methods
Select the cleaning method used
Corrosive Environment Maintenance
Ensure coil cleaning is part of the planned maintenance schedule
Clean all accumulations of dirt off the coil
Safety Precautions
Avoid using high-pressure water or air to prevent fin damage
Compressor Oil Level Check
Oil Level Inspection
Record the current oil level in the sight glass
Is the oil level within the acceptable range (1/8 to 3/8 of sight glass)?
Oil Addition
Is additional oil required?
Add Carrier-approved compressor oil if necessary
Post-Check Verification
Verify that the oil level is now within the acceptable range
Documentation
Refrigerant Circuit Leak Testing
Safety Precautions
Turn off all power to unit before servicing
Use field disconnect instead of ON-OFF switch on control panel
Leak Testing Procedure
Verify refrigerant circuit pressure
Conduct leak test if pressure is sufficient
Describe the method used for leak detection
Repair the leak using good refrigeration practices
Post-Repair Procedure
Access the parts list for your equipment in MaintainX.
Brass Pin For Tubes
853103-500
Brass Ring For Tubes
853002-570
Brass Pin For Holes Without Tubes
853103-1
Brass Ring For Holes Without Tubes
853002-631
Brass Pin For Tubes
853103-500
Brass Ring For Tubes
853002-570
Brass Pin For Holes Without Tubes
853103-1
Brass Ring For Holes Without Tubes
853002-631
Brass Pin For Tubes
853103-500
Brass Ring For Tubes
853002-570
Brass Pin For Holes Without Tubes
853103-1
Brass Ring For Holes Without Tubes
853002-631
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.