Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Grundfos Pump 45S75-15
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Pump Operation Check
Frequency of Starts and Stops
Verify minimum number of starts per year
Check maximum number of starts per hour and per day (for reference only)
Has the pump been run at least once this year to prevent issues from prolonged inactivity?
Initial Motor Protection Check
Motor Protection — Required Settings of Motor-Protective Circuit Breaker
Ensure the motor-protective circuit breaker is set to the rated maximum current of the motor.
Start the pump and let it run for half an hour at normal performance.
Slowly grade down the scale indicator until the motor trip point is reached.
Increase the setting by 5%.
Is the setting within the permissible range (not exceeding the rated maximum current of the motor)?
For motors wound for star-delta starting, ensure the motor-protective circuit breaker is set to rated maximum current × 0.58.
Is the startup time for star-delta starting or autotransformer starting within 2 seconds?
Safety Precautions
Motor and Cable Testing
Checking Motor and Cable
Switch off the power supply
Ensure power supply cannot be accidentally switched on
Supply Voltage
Measure the voltage between the phases using a voltmeter
Is the voltage within the specified range when the motor is loaded?
Stop the pump if there are large variations in voltage
Current Consumption
Measure the amps of each phase while the pump is operating
Initial Pump Startup Check
Startup
Ensure the pump is connected to protective earth
Switch off the power supply before starting any work on the product
Ensure the power supply cannot be accidentally switched on
Is the pump submerged in the liquid to be pumped?
Set the outlet valve to approximately 1/3 of its maximum volume of water
Check the direction of rotation as described in the section on Connection of three-phase motors
Are there impurities in the water?
Open the valve gradually as the water becomes clearer
Motor Liquid Level Check
Checking the Motor Liquid
Check the level of motor liquid
Is the motor liquid level sufficient?
Refill motor liquid using tap water if necessary
Grundfos MS6000 Motors
Is the motor delivered from stock?
Is the motor liquid level checked during service?
Position the submersible motor so the filling screw is at the highest point of the motor
Remove the screw from the filling hole
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX