MaintainX, an Autodesk company
EnterprisePricing
Grundfos

Grundfos Pump 45S15-4

Need answers fast?
Explore the manual using AI.

Grundfos Pump 45S15-4
Grundfos Pump 45S15-4

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Grundfos Pump 45S15-4

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Grundfos Pump 45S15-4

Grundfos Pump 45S15-4

Create an account to install this asset package.

Maintenance Plans for Grundfos Pump Model 45S15-4

Integrate maintenance plans directly into your work orders in MaintainX.

1 Monthly Storage Maintenance

Check mark

Storage

Check mark

Check storage temperature limits

Check mark

Ensure motors are stored in a closed, dry, and well-ventilated room

Check mark

Turn the shaft of MMS motors by hand at least once

Check mark

Is the pump protected from direct sunlight?

Check mark

Pump storage position

Check mark

Is the pump secured to prevent rolling or falling over?

Run this procedureArrow right

Motor Liquid Level Check

Check mark

Checking the Motor Liquid

Check mark

Check the level of motor liquid

Check mark

Is the motor liquid level sufficient?

Check mark

Refill motor liquid using tap water if necessary

Check mark

Grundfos MS6000 Motors

Check mark

Is the motor delivered from stock?

Check mark

Is the motor liquid level checked during service?

Check mark

Position the submersible motor so the filling screw is at the highest point of the motor

Check mark

Remove the screw from the filling hole

Run this procedureArrow right

Motor and Cable Testing

Check mark

Checking Motor and Cable

Check mark

Switch off the power supply

Check mark

Ensure power supply cannot be accidentally switched on

Check mark

Supply Voltage

Check mark

Measure the voltage between the phases using a voltmeter

Check mark

Is the voltage within the specified range when the motor is loaded?

Check mark

Stop the pump if there are large variations in voltage

Check mark

Current Consumption

Check mark

Measure the amps of each phase while the pump is operating

Run this procedureArrow right

Initial Pump Startup Check

Check mark

Startup

Check mark

Ensure the pump is connected to protective earth

Check mark

Switch off the power supply before starting any work on the product

Check mark

Ensure the power supply cannot be accidentally switched on

Check mark

Start the pump with the outlet valve closed off to approximately 1/3 of its maximum volume of water

Check mark

Check the direction of rotation as described in the section on Connection of three-phase motors

Check mark

If there are impurities in the water, open the valve gradually as the water becomes clearer

Check mark

Do not stop the pump until the water is completely clear

Check mark

Check the drawdown of the water level to ensure that the pump always remains submerged

Run this procedureArrow right

Initial Motor Protection Check

Check mark

Motor Protection — Required Settings of Motor-Protective Circuit Breaker

Check mark

Ensure the motor-protective circuit breaker is set to the rated maximum current of the motor

Check mark

Start the pump and let it run for half an hour at normal performance

Check mark

Slowly grade down the scale indicator until the motor trip point is reached

Check mark

Increase the setting by 5%

Check mark

Verify the highest permissible setting is the rated maximum current of the motor

Check mark

For motors wound for star-delta starting, ensure the motor-protective circuit breaker is set to rated maximum current × 0.58

Check mark

Verify the highest permissible startup time for star-delta starting or autotransformer starting is 2 seconds

Check mark

Safety Precautions

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Grundfos

Explore Other Assets