The Doosan Forklift GC25P-5 is a robust industrial forklift designed for efficient material handling in various environments. Known for its reliability and performance, this model excels in lifting and transporting heavy loads, making it an essential asset for warehouses and construction sites.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Doosan Forklift GC25P-5,

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Doosan Forklift GC25P-5,

Doosan Forklift GC25P-5,

Create an account to install this asset package.

Maintenance Plans for Doosan Forklift Model GC25P-5,

Integrate maintenance plans directly into your work orders in MaintainX.

1000 Hourly / 6 Monthly Coolant Hoses Inspection

Check mark

Warning: Ensure the machine is turned off and cooled down before starting the inspection

Check mark

Visual inspection of coolant hoses

Check mark

Visual inspection of clamps

Check mark

Check the two coolant lines that connect to the pressure regulator/converter

Check mark

Upload a photo of the inspected hoses and clamps

Check mark

Any hose showing signs of leakage?

Check mark

Any hose showing signs of swelling?

Check mark

Any hose showing signs of cracking?

Check mark

Any hose showing signs of abrasion?

Run this procedureArrow right

1000 Hourly / 6 Monthly Forklift Maintenance

Check mark

Inspect all fuel fittings and hoses

Check mark

Check carbuerator for air leaks in the filter system

Check mark

Replace carbuerator air filter element

Check mark

Sign off on the forklift maintenance

Run this procedureArrow right

1000 Hourly / 6 Monthly Fuel Lock-off Operation Testing

Check mark

NOTE! The length of time the engine runs on trapped fuel vapor increases with any increase in distance between the fuel lock-off and the pressure regulator/converter

Check mark

Start engine

Check mark

Locate the electrical connector for the fuel lock

Check mark

Disconnect the electrical connector

Check mark

The engine should run out of fuel and stop within a short period of time

Check mark

Turn the ignition key switch off and re-connect the fuel lock-off connector

Check mark

Sign off on the fuel lock-off operation testing

Run this procedureArrow right

1000 Hourly / 6 Monthly Pressure Regulator/Converter Inspection

Check mark

Visually inspect the pressure regulator/converter housing for coolant leaks

Check mark

Refer to Chapter 5 if the pressure regulator/converter requires replacement

Check mark

Visually inspect the fuel trim valves for abrasions or cracking

Check mark

Replace fuel trim valves if necessary

Check mark

To ensure a valve is not leaking a blow-by test can be performed

Check mark

With the engine off, disconnect the electrical connector to the FTVs

Check mark

Disconnect the vacuum line from the FTVs to the pressure regulator/converter at the converter’s tee connection

Check mark

Lightly blow through the vacuum line connected to the FTVs. Air should not pass through the FTVs when de-energized

Check mark

If air leaks past the FTVs when de-energized, replace the FTVs

Run this procedureArrow right

1500 Hourly / 9 Monthly Ignition System Inspection

Check mark

Spark plugs removed and inspected

Check mark

Spark plugs replaced?

Check mark

Ignition coil inspected for cracks and heat deterioration

Check mark

Coil heat sink fins visually inspected

Check mark

Any broken fins found?

Check mark

Fins replaced?

Check mark

Sign off on the ignition system inspection

Run this procedureArrow right

Parts for Doosan Forklift GC25P-5,

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Adapter

YA8661

Alternator Korea-Delphi CS121D

D167411

Alternator MICO/K1 Sealed

D187478

Snap-On

EEVPV311A

Adapter

YA8661

Alternator Korea-Delphi CS121D

D167411

Alternator MICO/K1 Sealed

D187478

Snap-On

EEVPV311A

Adapter

YA8661

Alternator Korea-Delphi CS121D

D167411

Alternator MICO/K1 Sealed

D187478

Snap-On

EEVPV311A

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Doosan

Explore Other Assets