MaintainX Asset Hub logo
EnterprisePricing
Donaldson

Donaldson Cartridge Dust Collector DWS 4-3

Need answers fast?
Explore the manual using AI.

Donaldson Cartridge Dust Collector DWS 4-3
Donaldson Cartridge Dust Collector DWS 4-3

The Donaldson Cartridge Dust Collector DWS 4-3 is an efficient industrial dust collection system designed to enhance air quality and maintain compliance. This model features advanced filtration technology, ensuring optimal performance in various applications while minimizing downtime and maintenance costs.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Donaldson Cartridge Dust Collector DWS 4-3

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Donaldson Cartridge Dust Collector DWS 4-3

Donaldson Cartridge Dust Collector DWS 4-3

Create an account to install this asset package.

Maintenance Plans for Donaldson Cartridge Dust Collector Model DWS 4-3

Integrate maintenance plans directly into your work orders in MaintainX.

Cartridge Dust Collector Filter Replacement

Check mark

Filter Removal and Installation

Check mark

Use proper safety and protective equipment when removing contaminants and filters.

Check mark

Dirty filters may be heavier than they appear.

Check mark

Use care when removing filters to avoid personal injury.

Check mark

Filter Removal

Check mark

Note: Remove filter cartridges by opening the top and bottom doors. Start with the top filters first. Optional plastic filter bags are offered for filter and dustpan dust removal for cleanliness.

Check mark

1. Turn the knob counterclockwise until it is loose. Remove the knob and access cover.

Check mark

2. Remove the filter cartridge from the yoke.

Check mark

Filter Installation

Run this procedureArrow right

Cartridge Dust Collector Operational Checklist

Check mark

Instruct all personnel on safe use and maintenance procedures.

Check mark

Use proper equipment and adopt all safety precautions needed for servicing equipment. Electrical service or maintenance work must be performed by a qualified electrician and comply with all applicable national and local codes.

Check mark

Turn power off and lock out electrical power sources before performing service or maintenance work.

Check mark

Do not install in classified hazardous atmospheres without an enclosure rated for the application.

Check mark

Turn compressed air supply off and bleed lines before performing service or maintenance work.

Check mark

Do not set compressed-air pressure above 50 psig. Component damage can occur.

Check mark

All compressed air components must be sized to meet the maximum system requirements of 60 psig supply pressure.

Check mark

The compressed-air supply must be oil and moisture free. Contamination in the compressed air used to clean filters will result in poor cleaning, cleaning valve failure, or poor collector performance.

Check mark

Purge compressed air lines to remove debris before connecting to the unit’s compressed air manifold.

Run this procedureArrow right

Chamber Silencer and Acoustic Curtain Replacement

Check mark

Warning: Electrical work must be performed by a qualified electrician and comply with all applicable national and local codes.

Check mark

Turn power off and lock out electrical power sources before performing service or maintenance work.

Check mark

Do not install in classified hazardous atmospheres without an enclosure rated for the application.

Check mark

Power turned off and locked out?

Check mark

Upload a photo of the power module before installation

Check mark

Acoustic curtain aligned with the non-louvre door holes?

Check mark

Acoustic curtain secured with nylon Christmas Tree clips?

Check mark

Upload a photo of the installed acoustic curtain

Check mark

Motors wired and rotation checked?

Run this procedureArrow right

Fluorescent Bulb Replacement

Check mark

Light Fixture

Check mark

Electrical work must be performed by a qualified electrician and comply with all applicable national and local codes.

Check mark

Turn power off and lock out electrical power sources before performing service or maintenance work.

Check mark

Do not install in classified hazardous atmospheres without an enclosure rated for the application.

Check mark

- Industrial Light Fixture

Check mark

This light fixture uses a wrap-around lens that is not fastened to the light housing by fasteners or latches.

Check mark

To remove the lens: Lift lens one side at a time up and away from the housing.

Check mark

To replace the bulbs: Rotate and remove from the rotary-lock lamp holders.

Check mark

Replace with 40-watt, 48-inch long fluorescent bulbs.

Run this procedureArrow right

IEC Control Panel Inspection

Check mark

IEC Control Panel with Programmable Logic Control

Check mark

This control panel contains a safety disconnect switch, blower motor control, pulse control functions, and a Magnehelic gauge. The Programmable Logic Control, PLC, provides features such as sequential start-up, staggered aftershift cleaning, and troubleshooting capabilities.

Check mark

Blower Control Functions

Check mark

1. This control panel includes magnetic starters with a low-voltage control circuit.

Check mark

2. The blower motor ON/OFF buttons are located on the control panel cover. A red blower motor RUNNING light is also provided.

Check mark

3. Sequential start-up is provided for all DWS 4- and DWS 6-2, 3, and 4 modules. This allows a delay between starting each blower motor and reduces undesirable overload current at start-up.

Check mark

4. The control panel has troubleshooting capabilities. If a blower motor shuts down due to a failure, such as an overload, the panel will flash the red RUNNING light quickly. The two amber lights, CLEANING and AFTERSHIFT CLEANING, will also flash indicating which circuit tripped the alarm.

Check mark

For example: The overload on motor protector #3 is tripped. The red RUNNING light will flash quickly and the two amber lights, CLEANING and AFTERSHIFT CLEANING, will flash three times, then pause and repeat. This indicates that motor protector #3 has been tripped. The lights will continue to flash until the alarm is serviced.

Check mark

5. Thermal overload relays and circuit breakers are provided for the motor circuit and fuses for the low voltage circuit. Standard voltages available are 208/230/460/575/60 Hz/3 phase.

Run this procedureArrow right

Parts for Donaldson Cartridge Dust Collector DWS 4-3

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Cellulex

P199411-016-340

Endura-Tek

P030685-016-340

Endura-Tek FR

P033840-016-340

Endura-Tek XL

P033023-016-340

Fibra-Web

P199413-016-431

Cellulex

P199411-016-340

Endura-Tek

P030685-016-340

Endura-Tek FR

P033840-016-340

Endura-Tek XL

P033023-016-340

Fibra-Web

P199413-016-431

Cellulex

P199411-016-340

Endura-Tek

P030685-016-340

Endura-Tek FR

P033840-016-340

Endura-Tek XL

P033023-016-340

Fibra-Web

P199413-016-431

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Donaldson

Explore Other Assets