MaintainX Asset Hub logo
EnterprisePricing
Dayton

Dayton Electric Chain Hoist 3YB96

Need answers fast?
Explore the manual using AI.

Dayton Electric Chain Hoist 3YB96
Dayton Electric Chain Hoist 3YB96

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Dayton Electric Chain Hoist 3YB96

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Dayton Electric Chain Hoist 3YB96

Dayton Electric Chain Hoist 3YB96

Create an account to install this asset package.

Maintenance Plans for Dayton Electric Chain Hoist Model 3YB96

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Chain Hoist Maintenance

Check mark

1. Inspect Operating Controls

Check mark

Possible Deficiencies:

Check mark

- Any deficiency causing improper operation

Check mark

2. Inspect Limit Switches

Check mark

Possible Deficiencies:

Check mark

- Any deficiency causing improper operation

Check mark

- Pitting or deterioration

Check mark

3. Inspect Brake Mechanism

Check mark

Possible Deficiencies:

Run this procedureArrow right

1 Daily Chain Inspection

Check mark

Chain is to be kept clean and lubricated.

Check mark

Visually check chain every time hoist is used.

Check mark

Hoist must not be operated when chain is twisted or kinked. An important phase of hoist maintenance is chain inspection. Check individual links and check for chain elongation.

Check mark

1. Check the chain for overall wear or stretch by selecting an unworn, unstretched length of chain (at the slack end for example).; Let the chain hang vertically with a light load (about 20 pounds) on the chain to pull it taut.; Use a large caliper to measure the outside length of a convenient number of links about 12 inches).; Measure the same number of links in a used section of chain and calculate the percentage increase in length of the worn chain.

Check mark

2. If the length of the worn chain is more than 1½% longer than the unused chain (0.015" per inch of chain measured), then the chain should be replaced.; If the chain is worn less than 1½%, check it at several more places along its length.

Check mark

If any section is worn more than 1½%, the chain should be replaced.

Check mark

CAUTION

Check mark

The chain used on this hoist has very carefully controlled dimensions and has been heat treated. Do not attempt to substitute other manufacturer's chain.;

Run this procedureArrow right

1 Daily Hooks Inspection

Check mark

1. Inspect hooks once daily for cracking, extreme wear or spreading. Replace hooks showing any of these signs.; If the throat openings are spread wider than the maximum permissible 15% increase listed here, the hooks have been overstressed and must be replaced.; Any hook that is bent or twisted more than 10 degrees from the plane of an unbent hook must also be replaced.

Check mark

2. The hook latches should be inspected to ensure that they close the hook throat opening in a secure manner when a load is applied.; Inspect the hook shank and nut for any stripping of the threads or other damage. The hook nut should be fully restrained by the retaining pin.

Check mark

3. In addition to above, load hooks should be inspected for cracks by the magnetic particle, dye penetrant or other suitable crack testing inspection method. This should be done at least once a year.;

Run this procedureArrow right

1 Monthly Chain Hoist Maintenance

Check mark

Periodic — Indicates items requiring inspection monthly to yearly. Inspections to be performed by or under the direction of a properly designated period.

Check mark

The exact period of inspection will depend on frequency and type of usage. Determination of this period will be based on the user’s experience.

Check mark

It is recommended that the user begin with a monthly inspection and extend the periods to quarterly, semi-annually or annually based on user’s monthly experience.

Check mark

Inspect Hook and Suspension for cracks, bending, stripped threads Lug Connections

Check mark

Inspect Pins, Bearings, Bushings for excessive wear, corrosion, cracks, distortion Shafts, Couplings

Check mark

Inspect Nuts, Bolts, Rivets for looseness, stripped and damaged threads, corrosion

Check mark

Inspect Sheaves for distortion, cracks, and excessive wear. Build-up of foreign substances

Check mark

Inspect Housings, Load Block for cracks, distortion. Excessive wear, internal build-up of foreign substances.

Check mark

Inspect Wiring and Terminals for fraying, defective insulation

Run this procedureArrow right

1 Monthly Load Hook Bearing Lubrication

Check mark

Warning: Ensure the machine is turned off before starting the lubrication process

Check mark

Select the type of service

Check mark

Was the Load Hook Bearing lubricated with SAE 30 gear or motor oil?

Check mark

Upload a photo of the lubricated Load Hook Bearing

Check mark

Sign off on the Load Hook Bearing lubrication

Run this procedureArrow right

Parts for Dayton Electric Chain Hoist 3YB96

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

10-24UNC X 1/2" Screw

H2970

#10 Spring Lockwasher

H4082P

1/4-20UNC X 1¼" Socket Head Cap Screw

S49-77

1/4-20UNC X 4" Screw

H1027P

1/4" Flatwasher

H4002P

10-24UNC X 1/2" Screw

H2970

#10 Spring Lockwasher

H4082P

1/4-20UNC X 1¼" Socket Head Cap Screw

S49-77

1/4-20UNC X 4" Screw

H1027P

1/4" Flatwasher

H4002P

10-24UNC X 1/2" Screw

H2970

#10 Spring Lockwasher

H4082P

1/4-20UNC X 1¼" Socket Head Cap Screw

S49-77

1/4-20UNC X 4" Screw

H1027P

1/4" Flatwasher

H4002P

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Dayton

Explore Other Assets