

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Dayton Electric Chain Hoist 3YB79
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Daily Chain Hoist Maintenance
Inspect Operating Controls
Deficiencies in Operating Controls
Inspect Limit Switches
Deficiencies in Limit Switches
Inspect Brake Mechanism
Deficiencies in Brake Mechanism
Inspect Hooks
Deficiencies in Hooks
Inspect Suspension Lug (if used)
1 Daily Chain Inspection
Chain is to be kept clean and lubricated.
Visually check chain every time hoist is used.
Hoist must not be operated when chain is twisted or kinked. An important phase of hoist maintenance is chain inspection. Check individual links and check for chain elongation.
1. Check the chain for overall wear or stretch by selecting an unworn, unstretched length of chain (at the slack end for example).; Let the chain hang vertically with a light load (about 20 pounds) on the chain to pull it taut.; Use a large caliper to measure the outside length of a convenient number of links about 12 inches).; Measure the same number of links in a used section of chain and calculate the percentage increase in length of the worn chain.
2. If the length of the worn chain is more than 1½% longer than the unused chain (0.015" per inch of chain measured), then the chain should be replaced.; If the chain is worn less than 1½%, check it at several more places along its length.
If any section is worn more than 1½%, the chain should be replaced.
CAUTION
The chain used on this hoist has very carefully controlled dimensions and has been heat treated. Do not attempt to substitute other manufacturer's chain.;
1 Daily Hooks Inspection
Inspect hooks for cracking, extreme wear or spreading
Check if throat openings are spread wider than the maximum permissible 15% increase
Check if any hook is bent or twisted more than 10 degrees from the plane of an unbent hook
Inspect the hook latches to ensure that they close the hook throat opening in a secure manner when a load is applied
Inspect the hook shank and nut for any stripping of the threads or other damage
Check if the hook nut is fully restrained by the retaining pin
Inspect load hooks for cracks by the magnetic particle, dye penetrant or other suitable crack testing inspection method
Sign off on the daily hooks inspection
1 Monthly Chain Hoist Maintenance
Periodic — Indicates items requiring inspection monthly to yearly. Inspections to be performed by or under the direction of a properly designated period.; The exact period of inspection will depend on frequency and type of usage. Determination of this period will be based on the user’s experience.; It is recommended that the user begin with a monthly inspection and extend the periods to quarterly, semi-annually or annually based on user’s monthly experience.
1. Inspect Hook and Suspension
Possible Deficiencies:; - Cracks, bending, stripped threads Lug Connections
2. Inspect Pins, Bearings, Bushings; Possible Deficiencies:; - Excessive wear, corrosion, cracks, distortion Shafts, Couplings
3. Inspect Nuts, Bolts, Rivets
Possible Deficiencies:; - Looseness, stripped and damaged threads, corrosion
4. Inspect Sheaves
Possible Deficiencies:; - Distortion, cracks, and excessive wear.
- Build-up of foreign substances
1 Monthly Load Hook Bearing Lubrication
Warning: Ensure the machine is turned off before starting the lubrication process
Select the type of service
Was the Load Hook Bearing lubricated with SAE 30 gear or motor oil?
Upload a photo of the lubricated Load Hook Bearing
Sign off on the Load Hook Bearing lubrication
Access the parts list for your equipment in MaintainX.
10-24UNC X 1/2" Screw
H2970
#10 Spring Lockwasher
H4082P
1/4-20UNC X 1¼" Socket Head Cap Screw
S49-77
1/4-20UNC X 4" Screw
H1027P
1/4" Flatwasher
H4002P
10-24UNC X 1/2" Screw
H2970
#10 Spring Lockwasher
H4082P
1/4-20UNC X 1¼" Socket Head Cap Screw
S49-77
1/4-20UNC X 4" Screw
H1027P
1/4" Flatwasher
H4002P
10-24UNC X 1/2" Screw
H2970
#10 Spring Lockwasher
H4082P
1/4-20UNC X 1¼" Socket Head Cap Screw
S49-77
1/4-20UNC X 4" Screw
H1027P
1/4" Flatwasher
H4002P
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













