

The Daikin Packaged Rooftop System DPS012AHMY4DW-4 is a high-efficiency HVAC solution designed for commercial applications. This rooftop unit offers reliable heating and cooling performance, ensuring optimal indoor comfort while minimizing energy consumption. Ideal for various building types, it combines advanced technology with robust construction for long-lasting operation.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Packaged Rooftop System DPS012AHMY4DW-4
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Rooftop System Maintenance
Warning: This maintenance requires trained and experienced service technician
Warning: Fuel pressure settings and control settings should be made only by persons thoroughly experienced with the burner and control system
Warning: Always replace covers on burner controls and boxes as the electrical contacts are sensitive to dust and dirt
Warning: Installation and maintenance must be performed only by qualified personnel who are experienced with this type of equipment and familiar with local codes and regulations
Notice: Gas or Hot Water Piping: A qualified Architect or Systems HVAC Design Engineer familiar with piping design, local codes and regulations, must provide piping design
Danger: Moving machinery and electrical power hazards. May cause severe personal injury or death. Disconnect and lock off all power before servicing equipment
Warning: Sharp edges are inherent to sheet metal parts, screws, clips, and similar items. May cause personal injury
Servicing Control Panel Components: Disconnect all electric power to the unit when servicing control panel components
Danger: Hazardous voltage. May cause severe injury or death. Disconnect electric power before servicing equipment
Filter Replacement
Select cabinet size
Select filter size for 003–006 cabinet
Select filter size for 003–006 with ERW cabinet
Select filter size for 007–015 cabinet
Select filter size for 007–015 with ERW cabinet
Select filter size for 007–015 with CORE cabinet
Select filter size for 016–028 cabinet
Select filter size for 016–028 with ERW cabinet
Select filter size for 016–028 with CORE cabinet
1 Monthly Coated Coil Cleaning
WARNING: Prior to cleaning the unit, turn off and lock out the main power switch to the unit and open all access panels
The following cleaning procedures are recommended as part of the routine maintenance activities for Option E Coated Coils. Documented routine cleaning of Option E Coated Coils is required to maintain warranty coverage.
1. Remove Surface Loaded Fibers: Surface loaded fibers or dirt should be removed prior to water rinse to prevent further restriction of airflow.
If unable to back wash the side of the coil opposite that of the coils entering air side, then surface loaded fibers or dirt should be removed with:
NOTE: Use of a water stream, such as a garden hose, against a surface loaded coil will drive the fibers and dirt into the coil. This will make cleaning efforts more difficult. Surface loaded fibers must be completely removed prior to using low velocity clean water rinse.
2. Periodic Clean Water Rinse: A monthly clean water rinse is recommended for coils that are applied in coastal or industrial environments to help to remove chlorides, dirt and debris.
An elevated water temperature (not to exceed 130°F) will reduce surface tension, increasing the ability to remove chlorides and dirt.
Pressure washer PSI must not exceed 900 psig and the nozzle should remain at least 1 foot from the coil to avoid damaging fin edges.
Sign off on the monthly coated coil cleaning
9000 Hours / 6 Monthly Rooftop System Maintenance
Check all moving parts for wear every six months
The Rebel exhaust fans are direct drive variable speed fan/motor combination, which do not have belts or pulleys to maintain
The bearings are permanently sealed and do not require periodic greasing. The Rebel 3-15 ton units have similar supply fans.
The Rebel 16-28 tons supply fans have a direct drive motor
These larger motors are not permanently sealed and will require greasing every 9000 hours
Optional Electric Heater Service
CAUTION: Severe loss of charge may occur if the high refrigerant pressure switch is replaced before reclaiming the refrigerant. Replace pressure switch after reclaiming refrigerant
DANGER: Hazardous voltage. May cause severe injury or death. Disconnect electric power before servicing equipment. More than one disconnect may be required to de-energize the unit
Service Refrigerant Sensors or Switches
Service Optional Electric Heater
Measure continuity through all fuses
Check that all electrical connections are tight. Look for signs of arcing
Check the resistance to ground for each circuit. It should be infinite
Check the resistance phase to phase for each circuit
Check all contactors
Access the parts list for your equipment in MaintainX.
Modulating Valve
M520B
Furnace Control
VB1200
Modulating Furnace
404231242
Staged Furnace
300049725
Staged Furnace
300049583
Modulating Valve
M520B
Furnace Control
VB1200
Modulating Furnace
404231242
Staged Furnace
300049725
Staged Furnace
300049583
Modulating Valve
M520B
Furnace Control
VB1200
Modulating Furnace
404231242
Staged Furnace
300049725
Staged Furnace
300049583
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













