

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Indoor Unit Wall Mounted Type FTXJ20MV1BW
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Rotation Pulse Check
Check No.16:
20/25/35 class
1. Check that the control voltage between the pins 10 - 11 is 15 VDC.
2. Check if the Hall IC generates the rotation pulse (0 ~ 15 VDC) 4 times between the pins 10 - 12, 10 - 13, when the fan motor i/s manually rotated once.
50 class
Make sure that the voltage of 320 ± 30 V is applied.
1. Set operation off and power off. Disconnect the connector S70.
2. Check that the voltage between the pins 4 - 7 is 320 VDC.
3. Check that the control voltage between the pins 3 - 4 is 15 VDC.
Power Supply Waveforms Check
Check No.11
Measure the power supply waveform between No. 1 and No. 2 on the terminal board
Check the waveform disturbance
Check if the power supply waveform is a sine wave (Fig.1)
Check if there is waveform disturbance near the zero-cross (sections circled in Fig.2)
Upload a photo of the waveform
Sign off on the power supply waveforms check
Main Circuit Short Check
Warning: Ensure the voltage between (+) and (–) of the diode bridge (DB1) is approximately 0 V before checking.
Enter the voltage between (+) and (–) of the diode bridge (DB1)
Measure the resistance between the pins of the DB1.
Enter the resistance between the pins of the DB1
Is the resistance ∞ or less than 1 kΩ?
If the resistance is ∞ or less than 1 kΩ, short circuit occurs on the main circuit.
Sign off on the main circuit short check
Thermistor Resistance Check
Warning: Disconnect the connectors of the thermistors from the PCB
Measure the resistance of each thermistor using a multimeter
If the room temperature thermistor is soldered on a PCB, remove the PCB from the control PCB
Measure the resistance of the room temperature thermistor
If the connector of indoor heat exchanger thermistor is soldered on a PCB, remove the thermistor
Measure the resistance of the indoor heat exchanger thermistor
Sign off on the thermistor resistance check
Inverter Analyzer Check
Warning: This procedure requires trained personnel with PPE!
Power turned off?
Install an inverter analyzer instead of a compressor
Charged voltage of the built-in smoothing electrolytic capacitor dropped to 10 VDC or below?
Terminals removed from the compressor?
Terminals connected to the terminals of the inverter analyzer without touching each other?
Activate power transistor test operation from the indoor unit
Power turned on?
FAN operation selected with the Mode button on the remote controller?
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













