MaintainX Logo
EnterprisePricing
Case

Case Mini Excavator CX47

Need answers fast?
Explore the manual using AI.

Case Mini Excavator CX47
Case Mini Excavator CX47

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Case Mini Excavator CX47

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Case Mini Excavator CX47

Case Mini Excavator CX47

Create an account to install this asset package.

Maintenance Plans for Case Mini Excavator Model CX47

Integrate maintenance plans directly into your work orders in MaintainX.

Hydraulic Equipment Removal

Check mark

Hydraulic pressure of the system released

Check mark

Return side cover opened and filter taken out

Check mark

Oil of the removed pipes drained into a container without spilling

Check mark

Plugs or caps applied on the pipe ends

Check mark

External surface of the equipment cleaned before disassembling

Check mark

Hydraulic and gear oil drained before placing equipment on the workbench

Run this procedureArrow right

Hydraulic Equipment Inspection

Check mark

1) Ensure that the disassembled parts are free from seizure, interference and uneven contact.

Check mark

2) Measure and record wear condition of parts and clearance.

Check mark

3) If the problem is found in a part, repair or replace it with a new one.

Run this procedureArrow right

Electrical Equipment Maintenance

Check mark

Do not disassemble electrical equipment.

Check mark

Handle it carefully not to drop and give a shock.

Check mark

Turn the key OFF prior to connecting and disconnecting work.

Check mark

Disconnect the connector by holding it and pressing the lock. Do not pull the wire to apply force to the caulking portion.

Check mark

Connect the connector and ensure it is completely locked.

Check mark

Turn the key OFF prior to touching the terminal of starter or generator.

Check mark

Remove the ground (earth} terminal of battery when handling tools around the battery or its relay.

Check mark

Do not splash water on the electrical equipment and connectors during machine washing.

Check mark

Check for moisture adhesion inside the waterproof connector after pulling it out, since it is hard to remove moisture from the connector. If moisture adhesion is found, dry it completely before the connection.

Run this procedureArrow right

Hydraulic Equipment Maintenance

Check mark

Warning: Do not disassemble, reassemble or modify the hydraulic equipment without the permission of the manufacturer.

Check mark

If disassembling and reassembling is unavoidable, refer the work to qualified personnel.

Check mark

Matching marks provided for reassembling work?

Check mark

Before starting the work, read the manual of disassembling procedure.

Check mark

Can the work be performed by yourself?

Check mark

Special jig and tools used if specified?

Check mark

If it is hard to remove a part according to the procedure, do not try it by force but investigate the cause.

Check mark

Removed parts placed in order and tagged for reassembling?

Check mark

Note the location and quantity of parts commonly applied to multiple locations.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Case

Explore Other Assets