Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Bosch Heat Pump CA009
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Heat Pump Inspection
Handling Periodic Lockouts
Check for water flow problems
Check for water temperature problems
Check for air flow problems
Check for air temperature problems
Use pressure and temperature charts to determine the cause
If continual lockouts occur, call a mechanic immediately
Refrigeration Equipment Check
Preliminary Checks
Ensure electrical components are fit for purpose and to the correct specification
Follow manufacturer's maintenance and service guidelines
Consult Bosch service and support if in doubt
Flammable Refrigerants Checks
Verify refrigerant charge is appropriate for room size
Check ventilation machinery and outlets for adequate operation and obstructions
Inspect secondary circuit for presence of refrigerant if using an indirect refrigerating circuit
Equipment Markings and Installation
1 Yearly Heat Pump Check
Performance Measurements
Record the voltage measurement
Record the current (amps) measurement
Record the water temperature difference for heating
Record the water temperature difference for cooling
Complete the check-out sheet on page 44
Was the check-up performed by a trained and qualified HVAC mechanic?
Electrical Device Check
Initial Safety Checks
Ensure that capacitors are discharged safely to avoid sparking.
Ensure no live-electrical components and wiring are exposed during system operations.
Ensure continuity of earth bonding.
Fault Handling
Is there a fault that could compromise safety?
If a fault exists, has the electrical supply been disconnected?
If the fault cannot be corrected immediately, has a temporary solution been implemented?
Describe the temporary solution used, if applicable.
2 Weekly Filter Cleaning
Safety Precautions
Ensure only trained and qualified personnel perform the service
Is the main power to the unit turned OFF?
Filter Cleaning
Remove the filter from the unit
Clean the filter thoroughly
Reinstall the filter into the unit
Post-Cleaning Check
Is the filter properly installed?
Access the parts list for your equipment in MaintainX.
PSC MOTOR 3/4 THROUGH 1 1/2 TON
873 883 280
PSC MOTOR 3/4 THROUGH 1 1/2 TON
873 883 281
PSC MOTOR 3/4 THROUGH 1 1/2 TON
873 883 280
PSC MOTOR 3/4 THROUGH 1 1/2 TON
873 883 281
PSC MOTOR 3/4 THROUGH 1 1/2 TON
873 883 280
PSC MOTOR 3/4 THROUGH 1 1/2 TON
873 883 281
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX