Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Atlanta Attachment Company Automatic Decorative Border Workstation 1312
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Daily Safety Equipment Check
Safety Equipment on the Machines
All machines are delivered with safety equipment, which shall not be removed or bypassed during operation.
Is the safety equipment on the machine intact and not bypassed?
The correct functioning of safety equipment on machines and systems should be checked every day and before every new shift starts, after maintenance and repair work, when starting up for the first time and when restarting (e.g. after prolonged shutdowns).
Is the safety equipment functioning correctly?
If safety equipment has to be dismantled for setting-up, maintenance or repair work, such safety equipment shall be replaced and checked immediately upon completing the maintenance or repair work.
Has the safety equipment been replaced and checked after maintenance or repair work?
All protective mechanisms shall be fitted and fully operational whenever the machine is at a standstill or if it has been shut down for a longer period of time.
Are all protective mechanisms fitted and fully operational?
Reflective Tape Maintenance
Warning: Follow the steps carefully to avoid damage to the tape
Soft cloth used for cleaning
No chemicals or abrasives used for cleaning
Avoided contact with oils and liquids
Did not touch the tape with bare fingers
Is the tape dirty or opaque?
If tape is dirty or opaque, report to the maintenance team
Sign off on the reflective tape maintenance
Electrical Equipment Maintenance
Repair, Electrical
The power supply must be switched off (master switch off) and secured so that it cannot be switched on again inadvertently before starting any work on live parts.
Those parts of the machine and plant on which inspection, maintenance or repair work is to be carried out must be isolated from the power supply, if specified. The isolated parts must first be checked to determine that they are truly de-energized before being grounded and short-circuited. Adjacent live parts must also be isolated.
The protective measures implemented (eg. grounding resistance) must be tested before restarting the machine after all assembly or repair work on electric parts.
Signal generators (limit switches) and other electrical parts on the safety mechanisms must not be removed or bypassed. Only use original fuses or circuit overloads with the specified current rating. The machine must be switched off immediately if a fault develops in the electrical power supply.
The electrical equipment of our machines must be checked at regular intervals and any defects found must be remedied immediately.
If it is necessary to carry out work on live parts, a second person should be on hand to operate the emergency OFF switch or master switch with voltage release in the event of an emergency. The working area should be cordoned off and marked by a warning sign. Only use electrically insulated tools.;
Automatic Decorative Border Workstation Maintenance
General Safety Instructions
Machine switched off and secured
Machine cleaned from oil, grease, dirt and waste
All screw connections retightened
Safety mechanisms refitted and checked
Maintenance, Care, Adjustment
Activities and intervals specified in the Instruction Manual observed
All hydraulic and pneumatic lines examined for leaks, loose connections, rubbing and damage
Waste, Disassembly, Disposal
Access the parts list for your equipment in MaintainX.
Pneumatic Diagram
1312-PD
Wiring Diagram
1312-WD
Bumper 5/16-24 X 1.0L
11200A
Brkt Air Lift Cylinder
112013
Roll Holder Assy, 11312 Horizontal Border Pleate
1312030
Pneumatic Diagram
1312-PD
Wiring Diagram
1312-WD
Bumper 5/16-24 X 1.0L
11200A
Brkt Air Lift Cylinder
112013
Roll Holder Assy, 11312 Horizontal Border Pleate
1312030
Pneumatic Diagram
1312-PD
Wiring Diagram
1312-WD
Bumper 5/16-24 X 1.0L
11200A
Brkt Air Lift Cylinder
112013
Roll Holder Assy, 11312 Horizontal Border Pleate
1312030
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX