MaintainX Logo
EnterprisePricing
Atlanta Attachment Company

Atlanta Attachment Company Automatic Decorative Border Workstation 1312

Need answers fast?
Explore the manual using AI.

Atlanta Attachment Company Automatic Decorative Border Workstation 1312
Atlanta Attachment Company Automatic Decorative Border Workstation 1312

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Atlanta Attachment Company Automatic Decorative Border Workstation 1312

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Atlanta Attachment Company Automatic Decorative Border Workstation 1312

Atlanta Attachment Company Automatic Decorative Border Workstation 1312

Create an account to install this asset package.

Maintenance Plans for Atlanta Attachment Company Automatic Decorative Border Workstation Model 1312

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Safety Equipment Check

Check mark

Safety Equipment on the Machines

Check mark

All machines are delivered with safety equipment, which shall not be removed or bypassed during operation.

Check mark

Is the safety equipment on the machine intact and not bypassed?

Check mark

The correct functioning of safety equipment on machines and systems should be checked every day and before every new shift starts, after maintenance and repair work, when starting up for the first time and when restarting (e.g. after prolonged shutdowns).

Check mark

Is the safety equipment functioning correctly?

Check mark

If safety equipment has to be dismantled for setting-up, maintenance or repair work, such safety equipment shall be replaced and checked immediately upon completing the maintenance or repair work.

Check mark

Has the safety equipment been replaced and checked after maintenance or repair work?

Check mark

All protective mechanisms shall be fitted and fully operational whenever the machine is at a standstill or if it has been shut down for a longer period of time.

Check mark

Are all protective mechanisms fitted and fully operational?

Run this procedureArrow right

Reflective Tape Maintenance

Check mark

Warning: Follow the steps carefully to avoid damage to the tape

Check mark

Soft cloth used for cleaning

Check mark

No chemicals or abrasives used for cleaning

Check mark

Avoided contact with oils and liquids

Check mark

Did not touch the tape with bare fingers

Check mark

Is the tape dirty or opaque?

Check mark

If tape is dirty or opaque, report to the maintenance team

Check mark

Sign off on the reflective tape maintenance

Run this procedureArrow right

Electrical Equipment Maintenance

Check mark

Repair, Electrical

Check mark

The power supply must be switched off (master switch off) and secured so that it cannot be switched on again inadvertently before starting any work on live parts.

Check mark

Those parts of the machine and plant on which inspection, maintenance or repair work is to be carried out must be isolated from the power supply, if specified. The isolated parts must first be checked to determine that they are truly de-energized before being grounded and short-circuited. Adjacent live parts must also be isolated.

Check mark

The protective measures implemented (eg. grounding resistance) must be tested before restarting the machine after all assembly or repair work on electric parts.

Check mark

Signal generators (limit switches) and other electrical parts on the safety mechanisms must not be removed or bypassed. Only use original fuses or circuit overloads with the specified current rating. The machine must be switched off immediately if a fault develops in the electrical power supply.

Check mark

The electrical equipment of our machines must be checked at regular intervals and any defects found must be remedied immediately.

Check mark

If it is necessary to carry out work on live parts, a second person should be on hand to operate the emergency OFF switch or master switch with voltage release in the event of an emergency. The working area should be cordoned off and marked by a warning sign. Only use electrically insulated tools.;

Run this procedureArrow right

Automatic Decorative Border Workstation Maintenance

Check mark

General Safety Instructions

Check mark

Machine switched off and secured

Check mark

Machine cleaned from oil, grease, dirt and waste

Check mark

All screw connections retightened

Check mark

Safety mechanisms refitted and checked

Check mark

Maintenance, Care, Adjustment

Check mark

Activities and intervals specified in the Instruction Manual observed

Check mark

All hydraulic and pneumatic lines examined for leaks, loose connections, rubbing and damage

Check mark

Waste, Disassembly, Disposal

Run this procedureArrow right

Parts for Atlanta Attachment Company Automatic Decorative Border Workstation 1312

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Pneumatic Diagram

1312-PD

Wiring Diagram

1312-WD

Bumper 5/16-24 X 1.0L

11200A

Brkt Air Lift Cylinder

112013

Roll Holder Assy, 11312 Horizontal Border Pleate

1312030

Pneumatic Diagram

1312-PD

Wiring Diagram

1312-WD

Bumper 5/16-24 X 1.0L

11200A

Brkt Air Lift Cylinder

112013

Roll Holder Assy, 11312 Horizontal Border Pleate

1312030

Pneumatic Diagram

1312-PD

Wiring Diagram

1312-WD

Bumper 5/16-24 X 1.0L

11200A

Brkt Air Lift Cylinder

112013

Roll Holder Assy, 11312 Horizontal Border Pleate

1312030

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Atlanta Attachment Company

Explore Other Assets