

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Sartorius Electronic Precision Scales EA6DCE-L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Strain-Gauge Load Cell Replacement
Preparation
Open the electronics module (see page 11)
Unplug the load-cell cable from the main PCB
Cable and Clamp Removal
Select the model type for specific instructions
DCE and EDE Models
Remove the strain-relief clamp in the electronics module (2 Phillips screws)
Remove the connecting cable
Save the 2 rubber cable guides for later reassembly
Scale Calibration
Calibration/Adjustment Sequence
Check and adjust the following factors
Adjusting the Overload Stops
Activate the BPI mode
Select 'Diagnostics' program in service software
Select 'High Resolution' subprogram
Read off the weight value on the Psion server or PC display
Activate 'Close' function in service software to reset scale to SBI mode
Setting the Center-Load Stops
Display PCB Replacement
Preparation
Disconnect the scale from the power supply
Remove the load plate
Remove or cut the wire tie holding the cable that connects the electronics module to the display and control unit
Access Electronics Module
Open the electronics module
Unplug the display PCB cable from the main PCB
Cable Removal for DCE and EDE Models
Release the strain-relief clamp in the electronics module (2 Phillips screws) and remove the cable
Main PCB Replacement
Preparation
Use the service software to read out and store the scale’s data record, if possible.
Order a pre-programmed PCB if data record cannot be stored, indicating the scale model and serial number.
Opening the Electronics Module
Disconnect the scale from the power supply.
Remove the load plate.
Remove the pan support from the strain-gauge load cell
Open the electronics module
Remove the cover.
Access the parts list for your equipment in MaintainX.
Sartocas Service Software Version 1.30 Or Later
6740-33
Psion Server, Complete, Version 4.6 Or Later
6739-98
Rs 232 Cable For Connecting The Scale To Pc
7357 312
4 Mm Torque Wrench (1 To 5 Nm) With Attachment
6737-04
Sartocas Service Software Version 1.30 Or Later
6740-33
Psion Server, Complete, Version 4.6 Or Later
6739-98
Rs 232 Cable For Connecting The Scale To Pc
7357 312
4 Mm Torque Wrench (1 To 5 Nm) With Attachment
6737-04
Sartocas Service Software Version 1.30 Or Later
6740-33
Psion Server, Complete, Version 4.6 Or Later
6739-98
Rs 232 Cable For Connecting The Scale To Pc
7357 312
4 Mm Torque Wrench (1 To 5 Nm) With Attachment
6737-04
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













