Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Rinnai Demand Duo Systems DD1 210i/ 315 int
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Demand Duo System Inspection
Inspection of All Items
Inspect for the following issues
Is the electric conduit, power supply cord or plug damaged?
Was the power supply cord and plug replaced by an authorised person?
Was a genuine replacement part from Rinnai used for replacement?
Tank Inspection
Check if the tank is leaking
PTR Valve Inspection
Check if PTR valves are leaking
Enter the cold inlet pressure (kPa)
Is the cold inlet pressure within the normal range (500-700 kPa)?
Is the water temperature in the tank close to 99°C?
Contact Rinnai service department if thermostatic controller or heating equipment has failed
Is the pressure and temperature low but valve is leaking?
Pull the lever for up to 30 seconds to clear foreign material
Primary Pump Inspection
Pump Installation Check
Verify pump installation conditions
Pump Operation Verification
Is the pump operation indicated on the controller screen?
Pump Bleeding and Inspection
Bleed pump using the chrome screw at the end of the pump casing
Is there excessive noise indicating damage or lack of bleed?
Is the impeller shaft spinning when inspected?
Flow Direction and Valve Check
Storage Tank Draining
!Warning: Draining MUST be carried out by a qualified person. Water may be HOT during draining.
Preparation
Isolate or turn ‘OFF’ the water heater at the electricity supply.
Close the cold water isolation valve at the inlet to the storage tank(s).
Close the water isolation valve at the return port from the gas water heater(s) on the storage tank(s).
Close the hot water isolation valve at the outlet of the storage tank(s).
Draining Process
Operate the PTR valve easing gear - gently. Operating the PTR valve easing gear will relieve the pressure in the water heater.
Undo the cold water inlet union.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX