

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

RenewAire Energy Recovery Ventilator HE2XINH
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Monthly Filter Cleaning
Visual Inspection of Filters
Inspect the condition of the filters
Does the filter need replacement?
Filter Replacement
Replace the filter if it looks discolored or dirty
Ensure no filter sprays are used during installation
Units with Filter Air Pressure Differential Sensors
Check for dirty filter alarm on the connected alarm or control device
Initial 24 Hours Energy Recovery Ventilator Maintenance
24 Hours Post Start-Up Maintenance
Readjust the tension on the motor drive belts
Check the air filters for dust, dirt, and debris
Initial 1 Month Energy Recovery Ventilator Maintenance
Electrical Connections
Tighten all electrical connections
Pay special attention to VFD wiring, if present
Readjust the tension on motor drive belts
Check the air filters as part of the normal monthly maintenance
1 Yearly Enthalpic Core Cleaning
CAUTION! Risk of DAMAGE TO ENTHALPIC CORES
Precautions to avoid damage
Preparation
Remove the air filters to access enthalpic cores
Cleaning Procedure
Vacuum all exposed surfaces of the enthalpic cores with an attachment having long, soft bristles
Note any visible damage or issues with the enthalpic cores
Post-Cleaning
Reinstall the air filters
Enthalpic Core Replacement
Enthalpic Core Removal
Switch the main disconnect to OFF
Open the door to the Energy Recovery Module
Pull each core straight out of its guides
Enthalpic Core Replacement
Ensure foam gasketing is on one end of each core
Reinstall the core with foam gasketing toward the back of the ERV
Ensure the core label is facing toward the front
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













