

The Komatsu Forklift Truck FD20T-14 is a robust and efficient industrial forklift designed for heavy-duty applications. Known for its reliability and performance, this model is ideal for warehouses and construction sites, ensuring optimal material handling and productivity.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Komatsu Forklift Trucks FD20T-14
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
2000 Hourly Forklift Trucks Maintenance
Check and adjust fuel injection timing (diesel engine)
Perform this operation to maintain compliance with EPA Diesel Engine Exhaust regulations.
Replace LPG mixer air valve diaphragm, under normal operating conditions.
Replace more often in cold or severe service applications.
Replace O-ring for LPG tank valve.
Sign off on the 2000 hourly forklift trucks maintenance
Fuses And Relays Replacement
32.1 REPLACING FUSES AND RELAYS
32.1.1 CHASSIS FUSES (ALL TRUCKS)
Turn the starting switch to the OFF position
Open the cover of the fuse box
Replace necessary fuses inside
32.1.2 ENGINE FUSES AND RELAYS
Turn the starting switch to the OFF position
Open the engine bonnet
Open the cover of the fuse box or relay box and replace the failed component
Forklift Trucks Cleaning
33.2 WASHING INSTRUCTIONS
CAUTION: If water gets into the electrical system (controller, sensor, connectors, etc.) it will cause malfunctions or operational failure. Do not wash the electrical system with water or high-pressure steam.
1. Turn the starting switch key to the OFF position, then remove the key.
2. Wash each part (1 to 4 parts in the figure at right), following the instructions in the table on the following page.
3. Dry off all wet areas with an air blower.
4. After checking that the washed parts have dried out, insert the starting switch key and turn it to the ON position, make sure that there is no abnormality, and then start operation.;
600 Hourly or 3 Monthly Forklift Trucks Maintenance
Clean LPG filter
Clean the “bronze mesh” LPG filter every 600 hours of operation or every 3 months of service, whichever comes first.
Replace the filter element every 2,400 hours of operation or every 12 months, whichever comes first.
In dusty operating conditions, carry out maintenance as often as possible.
1. Carefully remove the LPG filter (8) from the filter cover (10) located on the lower portion of the LPG Solenoid Valve. Use care not to damage the O-ring (9).
2. Clean bronze mesh filter with suitable cleaning solvent.
3. While wearing eye protection, blow out and dry the filter.
4. Reinstall the cleaned filter. Ensure that the O-ring is properly seated and gently tighten cover screws
Inspect PCV valve and hoses (gasoline engine)
Initial 200 Hours or 1 Month Forklift Trucks Maintenance
Change oil in hydraulic tank
Replace line filter
Clean strainer
Clean inside of tank
Change oil in engine oil pan
Replace engine oil filter cartridge (gasoline and diesel engines)
Check, adjust engine intake and exhaust valve clearance
Tighten (retorque) engine cylinder head bolts
Check air cleaner and replace element/filter if dirty
Access the parts list for your equipment in MaintainX.
Chain Wear Scale
661923
Chain Wear Scale
661923
Chain Wear Scale
661923
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













