

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Kelvion PHE Plate Heat Exchanger NT 350 M
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Plate Gaskets Replacement
Preparation
Prepare a time schedule for regular maintenance work
Contact Kelvion Sales Office prior to PHE maintenance
Is the PHE out of operation?
Inspection and Cleaning
Check for process-related deposits on HE plates
Is manual cleaning required for hard dirt?
Gasket Replacement
Are all HE plate gaskets being replaced at the same time?
Heat Exchanger Plates Cleaning
Preparation
Prepare a time schedule for regular maintenance work.
Contact Kelvion Sales Office prior to PHE maintenance.
Safety Precautions
Ensure PHE is out of operation before maintenance work.
Wear suitable protective equipment when handling aggressive cleaning media.
Have you been instructed in handling CIP cleaning?
Cleaning Process
Select the type of cleaning process to be used
Heat Exchanger Frame Maintenance
Preparation
Prepare a time schedule for regular maintenance work
Contact Kelvion Sales Office for detailed maintenance information
Safety Precautions
Ensure PHE is out of operation before maintenance work
Review chapter 6.3 Decommissioning for safety procedures
Cleaning and Maintenance
Clean the outside of the PHE frame
Grease the guide rails of B frames
Frame Gaskets Replacement
Preparation
Prepare a time schedule for regular maintenance work
Contact Kelvion Sales Office for guidance on PHE maintenance
Is the PHE out of operation before starting maintenance?
Inspection and Cleaning
Check for process-related deposits on HE plates that may affect performance
Is manual cleaning required for hard dirt deposits?
Gasket Replacement
Identify the type of gasket used between the HE plate pack and the frame components
Heat Exchanger Plates Chemical Cleaning
Preparation
Prepare a time schedule for regular maintenance work.
Contact Kelvion Sales Office prior to PHE maintenance.
Is the PHE out of operation prior to maintenance work?
Safety Precautions
Ensure PHE is decommissioned before starting maintenance.
Use cleaning agents that do not attack the HE plate gasket material.
Comply with safety regulations and follow cleaning agent producer recommendations.
Cleaning Process
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













