

The Gardner Denver Compressor EBQ99R is a robust industrial compressor designed for high efficiency and reliability. This model is ideal for various applications, providing consistent performance and durability in demanding environments. Regular maintenance ensures optimal operation and longevity of the EBQ99R.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Gardner Denver Compressor EBQ99R
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
125 Hour Maintenance
Check for dirt accumulation on oil/aftercooler core faces and the cooling fan
If cleaning is required, clean the exterior fin surfaces of the cores by blowing compressed air carrying a nonflammable safety solvent in a direction opposite that of the cooling fan air flow
Change the oil filter element every 1000 Hour
Change the compressor lubricant every 4000 Hour
Check the relief valve for proper operation every 1 Year
Regrease electric motor after one– or two–shift operation every 18 Month
Regrease electric motor after one– or two–shift operation every 12 Month
Regrease electric motor after continous operation every 9 Month
Regrease electric motor after continous operation every 6 Month
Compressor Oil System Check
The following readings are based on ambient temperature of 80 F (27 C) for air–cooled oil cooler and 80 F inlet water on water–cooled oil cooler, with the system in good condition
Compressor should be at operating temperature at the time of checks
One–half hour of loaded operation is usually sufficient to reach level–out operating temperatures
Enter the ambient temperature
Is the compressor at operating temperature?
Enter the time of loaded operation
Has the compressor reached level-out operating temperatures?
Sign off on the compressor oil system check
50 Hour Air Filter Cleaning
Warning: Ensure the machine is turned off and cooled down before starting the procedure
Remove the wingnut and pull out the filter element
Visually inspect the element. If cleaning is not necessary, reinstall the filter element
Wash the element by soaking about 15 minutes in warm water with a mild nonsudsing detergent
Enter the water pressure used for rinsing the element
Inspect the element for ruptures or cracks in the pleated media; replace the element if any are found
Inspect the gasket on the bottom (outlet end) of the element; replace the entire element if the gasket is damaged
Allow the element to air dry COMPLETELY. Do not expose the element to heat over 150 F (66 C)
Install the element in the filter body and fasten securely with the wing nut
8 Hour Inspection
Check the reservoir oil level - add oil if required
Observe if the unit loads and unloads properly
Check discharge pressure
Check discharge temperature
Check Panel LED's for advisories
Sign off on the 8 Hour Inspection
Inlet Tube Cleaning
Inspect the inlet screen and tube for dirt accumulation
Clean the tube when required by ramming a clean dry cloth through the tube
Wipe the inside of the filter body to remove any dirt falling from the inlet tube before reinstalling the element
Sign off on the inlet tube cleaning
Access the parts list for your equipment in MaintainX.
Kit
EAQ68330
Control Group
200ECM4002
Check Valve
90J113
Oil Stop Valve
90AR243
Kit
EAQ68330
Control Group
200ECM4002
Check Valve
90J113
Oil Stop Valve
90AR243
Kit
EAQ68330
Control Group
200ECM4002
Check Valve
90J113
Oil Stop Valve
90AR243
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













