Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Fairbanks Horizontal Split-Case Pump 5" 2876
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Packing Replacement
Preparation
Stop the pump
Removal of Old Packing
Unbolt and remove the glands away from the packing
Use a packing hook to remove the worn packing and water seal rings
Note the location of the water seal rings relative to the amount of packing on each side of the rings
Cleaning and Inspection
Clean the packing boxes and shaft sleeves
Inspect the shaft sleeves for wear or rough finish and replace if necessary
2000 Hourly / 2 Yearly Bearing Lubrication
Grease Lubricated Bearings
Stop the pump and remove the pipe plug at the bottom of the bearing housing.
Connect a grease gun to the lubrication fittings.
Inject grease until it relieves at the bearing housing cover and drain hole.
Remove the grease gun.
Start the pump and monitor bearing temperatures until they stabilize.
Stop the unit, wipe off the relieved grease and replace the drain plug.
Start the unit and resume normal operation.
Oil Lubricated Bearings
150 Hourly Packing Box Maintenance
Gland Adjustment
Lightly tighten the gland nuts
Loosen the gland nuts to allow adjustment with finger pressure
Is there a small flow of liquid to lubricate the packings?
Packing Inspection and Adjustment
Has the flow of liquid increased?
Add one ring of packing to the stuffing box if necessary
Readjust the gland after adding packing
Does the flow reduce after adjustment?
Pump Disassembly
Preparation
Lock out the power to the driver and close the suction and discharge valves.
Drain the pump.
Disconnect and remove the coupling or flexible shafting.
Disconnect and remove all auxiliary piping to the upper casing and bearing housings.
Upper Casing Removal
Remove the capscrews securing the upper casing half to the lower half.
Remove the gland nuts and slide the glands off the gland studs.
Install jackscrews in the tapped holes in the upper half casing flange and use them to separate the flanges.
Pump Assembly
CAUTION: READ THIS ENTIRE PROCEDURE BEFORE PROCEEDING.
Preparation and Cleaning
Thoroughly clean all parts to remove oil, grease, and foreign material.
Inspect parts for wear or damage and replace if required.
Move all parts to a clean and dust-free location for assembly.
Replace gaskets, grease seals, and bearings with new parts.
Impeller Wear Rings Replacement
Select the method for securing impeller wear rings
Rings Secured With Loctite
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX